Investors Hangout Stock Message Boards Logo
  • Mailbox
  • Favorites
  • Boards
    • The Hangout
    • NASDAQ
    • NYSE
    • OTC Markets
    • All Boards
  • Whats Hot!
    • Recent Activity
    • Most Viewed Boards
    • Most Viewed Posts
    • Most Posted
    • Most Followed
    • Top Boards
    • Newest Boards
    • Newest Members
  • Blog
    • Recent Blog Posts
    • Recently Updated
    • News
    • Stocks
    • Crypto
    • Investing
    • Business
    • Markets
    • Economy
    • Real Estate
    • Personal Finance
  • Market Movers
  • Interactive Charts
  • Login - Join Now FREE!
  1. Home ›
  2. Stock Message Boards ›
  3. Stock Boards ›
  4. 3Power Energy Group Inc (PSPW) Message Board

Gjiknuri: Shkodra did not overwhelm HPPs, but rain

Message Board Public Reply | Private Reply | Keep | Replies (0)                   Post New Msg
Edit Msg () | Previous | Next


Post# of 487
(Total Views: 316)
Posted On: 03/08/2018 3:58:17 PM
Posted By: Topfuel
Gjiknuri: Shkodra did not overwhelm HPPs, but rainfall
from Albanian newspaper - March 7, 2018

During the last two days from Shkodra there has been a repeated warning by Mayor Voltana Ademi for possible flooding in many areas, the 'HPPs' have become the HPPs, from where the water discharges started.

While Obot village is the first to "sail" under water, the danger is adequate, but KESH, Prefect of Shkodra and even Energy Minister Damian Gjiknuri have maintained the same line, linking the floods with dense rainfall and not with discharges from HPPs.

"The situation with the floods in Sub-Shkodra not from the HPP but from the rainfall. We have a protocol and regulation of dams that is implemented with precision. We have made the damages to the inhabitants for the past floods, even though I did not agree with what was imposed at the time after you were charged with KESH, "Gjiknuri said during the inspection of Vaja e Dejës.

Gjiknuri even expressed the lack of conformity with the bill of past floods handed over to KESH, but assured the residents that despite the HPP ports being opened, they are downloading controlled amounts of water.

"Downloads are controlled at 1400 meters / cubic in seconds. They are compulsory as we are faced with numerous streams that have cascades from rainfall and melting snow. Fierza is at 295 meters quota, maximum 296 meters allowed. Therefore, there will be downloads, but without risk of massive flooding as in 2010-2011, "said the Minister of Energy.

March 7, 2018 (gazeta-Shqip.com)


(2)
(0)




3Power Energy Group Inc (PSPW) Stock Research Links


  1.  
  2.  


  3.  
  4.  
  5.  


All of my posts are my opinion only and are not meant to be investment advice.




Investors Hangout

Home

Mailbox

Message Boards

Favorites

Whats Hot

Blog

Settings

Privacy Policy

Terms and Conditions

Disclaimer

Contact Us

Whats Hot

Recent Activity

Most Viewed Boards

Most Viewed Posts

Most Posted Boards

Most Followed

Top Boards

Newest Boards

Newest Members

Investors Hangout Message Boards

Welcome To Investors Hangout

Stock Message Boards

American Stock Exchange (AMEX)

NASDAQ Stock Exchange (NASDAQ)

New York Stock Exchange (NYSE)

Penny Stocks - (OTC)

User Boards

The Hangout

Private

Global Markets

Australian Securities Exchange (ASX)

Euronext Amsterdam (AMS)

Euronext Brussels (BRU)

Euronext Lisbon (LIS)

Euronext Paris (PAR)

Foreign Exchange (FOREX)

Hong Kong Stock Exchange (HKEX)

London Stock Exchange (LSE)

Milan Stock Exchange (MLSE)

New Zealand Exchange (NZX)

Singapore Stock Exchange (SGX)

Toronto Stock Exchange (TSX)

Contact Investors Hangout

Email Us

Follow Investors Hangout

Twitter

YouTube

Facebook

Market Data powered by QuoteMedia. Copyright © 2025. Data delayed 15 minutes unless otherwise indicated (view delay times for all exchanges).
Analyst Ratings & Earnings by Zacks. RT=Real-Time, EOD=End of Day, PD=Previous Day. Terms of Use.

© 2025 Copyright Investors Hangout, LLC All Rights Reserved.

Privacy Policy |Do Not Sell My Information | Terms & Conditions | Disclaimer | Help | Contact Us