Investors Hangout Stock Message Boards Logo
  • Mailbox
  • Favorites
  • Boards
    • The Hangout
    • NASDAQ
    • NYSE
    • OTC Markets
    • All Boards
  • Whats Hot!
    • Recent Activity
    • Most Viewed Boards
    • Most Viewed Posts
    • Most Posted
    • Most Followed
    • Top Boards
    • Newest Boards
    • Newest Members
  • Blog
    • Recent Blog Posts
    • Recently Updated
    • News
    • Stocks
    • Crypto
    • Investing
    • Business
    • Markets
    • Economy
    • Real Estate
    • Personal Finance
  • Market Movers
  • Interactive Charts
  • Login - Join Now FREE!
  1. Home ›
  2. Stock Message Boards ›
  3. Stock Boards ›
  4. 3Power Energy Group Inc (PSPW) Message Board

Thought about HydroPower Insurance? Risk/reward p

Message Board Public Reply | Private Reply | Keep | Replies (1)                   Post New Msg
Edit Msg () | Previous | Next


Post# of 487
(Total Views: 649)
Posted On: 03/05/2018 7:42:48 PM
Posted By: Topfuel
Thought about HydroPower Insurance?
Risk/reward protection?
EC3 legal is Menastat Secretary on their board, I really doubt they would let the filings be late without just cause, (Top shelf group) Interesting they have someone like this doing their financials and filings

specialist, in-depth insurance sector experience, where market knowledge is vital in understanding issues, you will find our advice practical and appropriate even in the most demanding or complex of legal situations.

https://ec3legal.com/sectors.html

I found this info from northern Alliance about Hydro insurance

Northern Alliance has a wealth of experience in placing hydro insurance and have provided insurance solutions for micro, medium & larger hydro power projects. The projects have been both community funded and privately funded and have involved both the development of new sites and the renovation of existing water mills or former hydro sites.
We are also members of the British Hydropower Association. The British Hydropower Association (BHA) is the professional trade membership organisation representing the interests of the UK hydropower industry and its associated stakeholders at regional, national and global levels.

Our hydro insurance cover offers bespoke cover from pre planning through to the site being fully operational. We can arrange hydro insurance for the following types of hydro projects –

Run-of-the-river: the natural flow and elevation drop (head) of a river are used to generate electricity. Power stations of this type are built on rivers with a consistent and steady flow.
Diversion: the supply of water is taken from a dammed river or lake to a remote powerhouse containing the turbine and generator. A Canal or low-pressure tunnel transports the water to this end point and then back to the river to continue its course.
Pumped Storage: water is pumped using reversible pumping/generating units from a lower reservoir to an upper reservoir when demand for electricity is low. During periods of high electricity demand, the water from the upper reservoir is released back to the lower reservoir through the reversible units to generate power.
Impoundment: river water is stored in a reservoir behind an impounding structure, typically a dam or a weir. The water is released as needed to meet energy requirements.
Hydro Insurance for Construction/Erection Phase
Employers Liability Insurance
Public Liability Insurance
Professional Indemnity Insurance
Contractors All Risks insurance inc Contract Works Insurance
Delay in Start Up/Advanced Profits Insurance
Goods in Transit Insurance/Marine Insurance
Environmental Liability Insurance
Legal Expenses
Reinstatement / Decommissioning Insurance – Alternative to a bond
Hydro Insurance for Operational Phase
All Risks Insurance Cover for Plant/Equipment
Breakdown Cover
Loss of Revenue Insurance (Business Interruption cover)
Public Liability Insurance
Legal Expenses
Insurance considerations for hydro power
As with wind power the proposed sites for hydro tend to be in remote/rural locations, this can lead to logistic problems with getting replacement parts to the hydro site and subsequently increasing the disruption to the hydro plant.
Hydro plants have a tendency to breakdown with the costs of labour and parts to repair expensive to insurance companies.
The risks of natural perils damaging and interrupting a hydro plant are high with the increased danger landslide, snow slide and flooding in the immediate vicinity of the hydro plant. These events are increasingly more likely in winter months.
Whilst the replacement/repair costs of other renewable technologies are reducing, the cost of hydro is still very high compared with other renewables. The development of a hydro site is very labour intensive with major civil works often required.


(2)
(0)




3Power Energy Group Inc (PSPW) Stock Research Links


  1.  
  2.  


  3.  
  4.  
  5.  


All of my posts are my opinion only and are not meant to be investment advice.




Investors Hangout

Home

Mailbox

Message Boards

Favorites

Whats Hot

Blog

Settings

Privacy Policy

Terms and Conditions

Disclaimer

Contact Us

Whats Hot

Recent Activity

Most Viewed Boards

Most Viewed Posts

Most Posted Boards

Most Followed

Top Boards

Newest Boards

Newest Members

Investors Hangout Message Boards

Welcome To Investors Hangout

Stock Message Boards

American Stock Exchange (AMEX)

NASDAQ Stock Exchange (NASDAQ)

New York Stock Exchange (NYSE)

Penny Stocks - (OTC)

User Boards

The Hangout

Private

Global Markets

Australian Securities Exchange (ASX)

Euronext Amsterdam (AMS)

Euronext Brussels (BRU)

Euronext Lisbon (LIS)

Euronext Paris (PAR)

Foreign Exchange (FOREX)

Hong Kong Stock Exchange (HKEX)

London Stock Exchange (LSE)

Milan Stock Exchange (MLSE)

New Zealand Exchange (NZX)

Singapore Stock Exchange (SGX)

Toronto Stock Exchange (TSX)

Contact Investors Hangout

Email Us

Follow Investors Hangout

Twitter

YouTube

Facebook

Market Data powered by QuoteMedia. Copyright © 2025. Data delayed 15 minutes unless otherwise indicated (view delay times for all exchanges).
Analyst Ratings & Earnings by Zacks. RT=Real-Time, EOD=End of Day, PD=Previous Day. Terms of Use.

© 2025 Copyright Investors Hangout, LLC All Rights Reserved.

Privacy Policy |Do Not Sell My Information | Terms & Conditions | Disclaimer | Help | Contact Us