or can they? The logistics will be driven by the d
Post# of 43064
or can they? The logistics will be driven by the desire to reduce plastic in landfills...
and the savings on costs incurred now to bury the waste plastic in landfills.
IMO it is NOT JBI's job to gather the plastic from the disposers of waste... there is self-interest all along the pipeline to get the plastic routed to JBI (and save money while doing so). The handling and processing of the plastic becomes JBI's responsibility once the plastic reaches a JBI site.