Too soon, DJ. I'm thinking he gets it around 3/
Post# of 72435
I'm thinking he gets it around 3/8. Soft database lock around that time. Two weeks to finalize everything. Meet with BP behind closed doors.
We get our top line data the week of 3/19 is my guess.
Go IPIX!
![Like This Post](/images/thumb-up.png)
![Dislike This Post](/images/thumb-down.png)