Investors Hangout Stock Message Boards Logo
  • Mailbox
  • Favorites
  • Boards
    • The Hangout
    • NASDAQ
    • NYSE
    • OTC Markets
    • All Boards
  • Whats Hot!
    • Recent Activity
    • Most Viewed Boards
    • Most Viewed Posts
    • Most Posted
    • Most Followed
    • Top Boards
    • Newest Boards
    • Newest Members
  • Blog
    • Recent Blog Posts
    • Recently Updated
    • News
    • Stocks
    • Crypto
    • Investing
    • Business
    • Markets
    • Economy
    • Real Estate
    • Personal Finance
  • Market Movers
  • Interactive Charts
  • Login - Join Now FREE!
  1. Home ›
  2. Stock Message Boards ›
  3. Stock Boards ›
  4. 3Power Energy Group Inc (PSPW) Message Board

Hydro updates: check this site out: http://riverw

Message Board Public Reply | Private Reply | Keep | Replies (0)                   Post New Msg
Edit Msg () | Previous | Next


Post# of 487
(Total Views: 265)
Posted On: 11/27/2017 7:51:03 AM
Posted By: joemonte1
Hydro updates: check this site out: http://riverwatch.eu/en/balkanrivers/news/dat...kan-rivers

DATA UPDATE 2017: HPPS ON BALKAN RIVERS

24 Nov, 2017 By admin
Every two years, we analyze the situation of hydropower development in the Balkans, updating the data of existing and planned hydropower plants as well as those currently under construction in the entire region. Moreover, we assess how many of these projects are located/planned in protected areas. After our last update in 2015, a new data update is now available. This unique data set makes the extent of the threat to the Blue Heart of Europe visible: our warnings are confirmed, the dam tsunami has started to roll.



Results

Currently, 2,796 hydropower plants are in the planning phase, 188 are under construction, while another 1,004 plants are already operating. 1,031 (or 37%) of the planned dams are projected to be built in protected areas with high protection status (118 of which in national parks, 547 in Natura 2000 areas).





Comparing the latest update with our 2015 data shows that

the speed of construction of new hydropower plants is increasing. Currently, 188 projects are under construction, while in 2015 it was only 61
hotspots of ongoing river destruction is Albania (81 projects under construction), Serbia (30), Macedonia (22) and Bosnia and Herzegovina (19). Less projects are currently being pushed in Slovenia, Croatia and Montenegro
in the past 2 years, approximately 160-180 plants have been completed
91% of those under construction are projects with a planned installed capacity below 10 megawatts (MW) for which no Environmental Impact Assessment (EIA) is required.
practically all bigger plants under construction are being built in Albania: 10 out of 13 projects with capacities between 10-50 MW, and 2 out of 3 with capacities above 50 MW
next to Albania and Bosnia and Herzegovina, a future hotpots of dam construction will be Serbia in particular, where a total of 826 plants are projected.
Figure 1. Hydropower plants by countries
Figure 1. Hydropower plants by countries



Protected Areas

Protected areas do not provide protection against hydropower plants; their protection status is being severely undermined. A total of 1,447 hydropower plants and projects are located within protected areas with high protection status (national parks, Natura 2000, national protected areas), of which
1,031 are in the planning phase. In 2015, “only” 535 projects were planned in protected areas, so the number has doubled since
51 are under construction
365 are in operation
National parks: 118 projects are planned within national parks (2015: 113), 21 are under construction (!), 52 are in operation.
Natura 2000: 547 projects are planned within Natura 2000 areas (2015: 131), 7 are under construction, 248 are in operation. Natura 2000 is a network of EU protected areas, thus only the EU member states Slovenia, Croatia, Greece and Bulgaria have been taken into account. The significant increase of projects within this category is linked to improved data for Bulgaria compared to the 2015 data set.
Figure 2. Hydropower plants in protected areas
Figure 2. Hydropower plants in protected areas



Method

The data update was conducted by the consultant FLUVIUS Floodplain Ecology and River Basin Management by means of intensive satellite imagery research, as well as data from national and international sources, company and bank websites, news articles, etc. With respect to power plants in protected areas it must be noted that only data on hydropower plants has been updated in the course of this analysis, and not that of protected areas. New protected areas which have been designated since 2015 are thus not included in this analysis. This means that the actual number of hydropower plants within protected areas is likely to be even higher.



DOWNLOADS

2017 Data Set Summary
Collection of graphs


(2)
(0)




3Power Energy Group Inc (PSPW) Stock Research Links


  1.  
  2.  


  3.  
  4.  
  5.  






Investors Hangout

Home

Mailbox

Message Boards

Favorites

Whats Hot

Blog

Settings

Privacy Policy

Terms and Conditions

Disclaimer

Contact Us

Whats Hot

Recent Activity

Most Viewed Boards

Most Viewed Posts

Most Posted Boards

Most Followed

Top Boards

Newest Boards

Newest Members

Investors Hangout Message Boards

Welcome To Investors Hangout

Stock Message Boards

American Stock Exchange (AMEX)

NASDAQ Stock Exchange (NASDAQ)

New York Stock Exchange (NYSE)

Penny Stocks - (OTC)

User Boards

The Hangout

Private

Global Markets

Australian Securities Exchange (ASX)

Euronext Amsterdam (AMS)

Euronext Brussels (BRU)

Euronext Lisbon (LIS)

Euronext Paris (PAR)

Foreign Exchange (FOREX)

Hong Kong Stock Exchange (HKEX)

London Stock Exchange (LSE)

Milan Stock Exchange (MLSE)

New Zealand Exchange (NZX)

Singapore Stock Exchange (SGX)

Toronto Stock Exchange (TSX)

Contact Investors Hangout

Email Us

Follow Investors Hangout

Twitter

YouTube

Facebook

Market Data powered by QuoteMedia. Copyright © 2025. Data delayed 15 minutes unless otherwise indicated (view delay times for all exchanges).
Analyst Ratings & Earnings by Zacks. RT=Real-Time, EOD=End of Day, PD=Previous Day. Terms of Use.

© 2025 Copyright Investors Hangout, LLC All Rights Reserved.

Privacy Policy |Do Not Sell My Information | Terms & Conditions | Disclaimer | Help | Contact Us