Treaty
Post# of 39368
Treaty Energy Drilling Update
January 11, 2013
Treaty Energy Drilling has secured 2 outside Drilling contracts for the Failing 1500 Rig in Pecos County, Texas.
The 1st well is a shallow re-entry, with the rig scheduled to be on location today, January 11th, 2013. The 2nd well is a new drill that is scheduled to begin on or before February 15th, 2013.
In addition to the 2 executed contracts; Treaty Drilling is expected to be awarded a 4 Well contract utilizing the larger Wilson 42 Rig later this month.
Additional details will be provided as developments occur.