The 27th of Sept. should mark the 2,000 hour run time on the QD - LED micro chip and on Nov. 8th they should arrive at the 3,000 hour test protocol time line. Hope to get an up-date from them.I wonder how much they paid for that entire micro chip assembly.Thats a very well designed little unit.
(0)
(0)
Quantum Materials Corp. (QTMM) Stock Research Links