Somebody's crying in their beer tonight..... I got
Post# of 41413
On another note, rumor from the Ops side of the house is that there's a Precertification meeting with the Operations folks and the Indy FSDO the first week of May in Indianapolis. I'm sure the results of that will come out at the SHM.
As was addressed in today's PR, the relationship with Kalitta is strong. 2 of the 3 jets Kalitta's bringing into the country for retrofit are being readied by Kalitta for Baltia's acceptance, when the time is right. Some on this board may not know or recall that Kalitta is owed a pretty large sum. Mayby $500,000 from previous work accomplished on the 747, and was paid mostly in stock. So I think Kalitta has a huge vested interest in assuring this project gets through certification and becomes operational. They'll probably get 10-20x their money at that point.
Lots of good stuff happening! Hang in there a little longer for the fireworks!!