Investors Hangout Stock Message Boards Logo
  • Mailbox
  • Favorites
  • Boards
    • The Hangout
    • NASDAQ
    • NYSE
    • OTC Markets
    • All Boards
  • Whats Hot!
    • Recent Activity
    • Most Viewed Boards
    • Most Viewed Posts
    • Most Posted
    • Most Followed
    • Top Boards
    • Newest Boards
    • Newest Members
  • Blog
    • Recent Blog Posts
    • Recently Updated
    • News
    • Stocks
    • Crypto
    • Investing
    • Business
    • Markets
    • Economy
    • Real Estate
    • Personal Finance
  • Market Movers
  • Interactive Charts
  • Login - Join Now FREE!
  1. Home ›
  2. Stock Message Boards ›
  3. User Boards ›
  4. NASDAQ OMX GlobeNewswire Message Board

Topping out ceremony held at New Children’s Hosp

Message Board Public Reply | Private Reply | Keep | Replies (0)                   Post New Msg
Edit Msg () | Previous | Next


Post# of 301275
(Total Views: 40)
Posted On: 03/30/2017 8:00:22 AM
Avatar
Posted By: News Desk 2018
Topping out ceremony held at New Children’s Hospital

Espoo, Finland, 2017-03-30 13:00 CEST (GLOBE NEWSWIRE) -- SRV GROUP PLC                      PRESS RELEASE                                   30 MARCH 2017, AT 14.00

Topping out ceremony held at New Children’s Hospital

The construction of the New Children’s Hospital is progressing as planned, and the hospital has reached an important milestone – its topping out ceremony. The New Children’s Hospital’s topping out ceremony was held on Thursday, 30 March in Meilahti, Helsinki. The first half of the hospital will be completed for the installation of the user’s medical equipment in November 2017, and the rest of the hospital in June 2018. SRV is the project’s main contractor.

“The New Children’s Hospital is an excellent example of a challenging project in which open cooperation, careful advance planning and new solutions have helped achieve tight targets. Construction has gone well, and the project is progressing in accordance with set objectives, even though it has involved a tight schedule, overlapping planning and construction, and a restricted plot in the middle of a functioning hospital area,” says SRV’s Juha Toimela, Senior Vice President, Operations in Finland.

Excavation work began at the New Children’s Hospital in August 2014. Now an impressive façade covering, of which around one third has been completed, is being installed at the site. Inside the building, painting, tiling, floor covering and ceiling work, intermediate door and patient panel fittings as well as building systems work are under way.

“Particular successes to date have been the completion of the frame and the façade ahead of schedule from late summer 2016. With the selected implementation methods, the frame and the façade were quickly erected, enabling a faster start to be made on interior work, protected from the weather and moisture. The drying and quality of the structures has been measured and checked throughout construction,” says Site Manager Matti Julin .

Otherwise, the project has invested heavily in moisture and cleanliness management in order to achieve a safe and healthy work environment and end result, and tackling the shadow economy has also been an issue of particular focus. In addition, with an eye to the hospital’s future, the frame has been made flexible and adaptable, so that in the future interior spaces can be changed according to need. Currently, 265 people are working on the site. During the entire time of construction, a total around 3,000 people will work on the site.

The New Children’s Hospital will have eight floors above ground, a basement, and a machine room floor on the roof. The hospital will have within it a stunning 2,069 rooms, including 12 operating rooms, 16 intensive care units, 118 wards and 220 consultation or rehabilitation rooms.

SRV’s strong role as a hospital builder is reflected not only in the New Children’s Hospital, but also in other projects under way, such as the new building project in the front yard at TAYS Central Hospital in Tampere, Central Finland’s Hospital Nova in Jyväskylä, and the Kalasatama health and wellness centre in Helsinki. The total value of the several hospital and healthcare projects being built by SRV is currently EUR 650 million.

Further information:

Juha Toimela, SVP, Operations in Finland, +358 40 594 5473, juha.toimela@srv.fi Matti Julin, Site Manager, +358 40 070 4293, matti.julin@srv.fi  Päivi Kauhanen, SVP, Communications, +358 50 598 9560, paivi.kauhanen@srv.fi

www.srv.fi

You can also find us in the social media: Facebook    LinkedIn    Twitter    Instagram

SRV - Building for life



(0)
(0)








Investors Hangout

Home

Mailbox

Message Boards

Favorites

Whats Hot

Blog

Settings

Privacy Policy

Terms and Conditions

Disclaimer

Contact Us

Whats Hot

Recent Activity

Most Viewed Boards

Most Viewed Posts

Most Posted Boards

Most Followed

Top Boards

Newest Boards

Newest Members

Investors Hangout Message Boards

Welcome To Investors Hangout

Stock Message Boards

American Stock Exchange (AMEX)

NASDAQ Stock Exchange (NASDAQ)

New York Stock Exchange (NYSE)

Penny Stocks - (OTC)

User Boards

The Hangout

Private

Global Markets

Australian Securities Exchange (ASX)

Euronext Amsterdam (AMS)

Euronext Brussels (BRU)

Euronext Lisbon (LIS)

Euronext Paris (PAR)

Foreign Exchange (FOREX)

Hong Kong Stock Exchange (HKEX)

London Stock Exchange (LSE)

Milan Stock Exchange (MLSE)

New Zealand Exchange (NZX)

Singapore Stock Exchange (SGX)

Toronto Stock Exchange (TSX)

Contact Investors Hangout

Email Us

Follow Investors Hangout

Twitter

YouTube

Facebook

Market Data powered by QuoteMedia. Copyright © 2025. Data delayed 15 minutes unless otherwise indicated (view delay times for all exchanges).
Analyst Ratings & Earnings by Zacks. RT=Real-Time, EOD=End of Day, PD=Previous Day. Terms of Use.

© 2025 Copyright Investors Hangout, LLC All Rights Reserved.

Privacy Policy |Do Not Sell My Information | Terms & Conditions | Disclaimer | Help | Contact Us