$EXSFF...PDAC... With the PDAC just two weeks away
Post# of 154
We’ve seen some good progress with the drilling north of the Kidd Mine. Despite various difficulties, the crew have achieved a depth of roughly 1,150meters (about 3,500feet). My sources have indicated we have drilled through some exhalate intermittently, and that’s exciting, but continue downward through mafic & ultramafic layers, with the intended target in the 1,300 to 1,400meter strata zone. I’m optimistic that with problems kept to a minimum, we could achieve that depth later this week. Hitting exhalate is the single best indicator that we are close to a VMS deposit.
I am hoping to see the final numbers for the Chester drilling sometime this week. As I’ve expressed previously, I’ve heard some good things about the core, and am anxious to read the official news when it comes out. The rumor suggests the results could easily expand the size & scope of the deposit. The Senior Geo in charge of that is a stickler for detail, but I’m hearing he’s close to turning everything over to the Company. With Copper trading up over the past few weeks, currently at US$2.73/lb, the deposit at Chester is looking more & more attractive.
I’m hearing drilling will take place at both the PG-101, and the East Bay property block during 2017. To my knowledge, a final date & time for the Teck video teleconference has not been established as yet, but the minute I know, you’ll know.