Confirmation of Cougar drilling rig shipped to Mad
Post# of 119
Five-page PDF @ http://www.asx.com.au/asxpdf/20170209/pdf/43fwnrwtm061xm.pdf
Quote:
- RC Drill Rig dispatched from Brazil on route to Madagascar; expected to arrive in country in early March 2017.
- Drill program expected to commence mid-March 2017 and aims to test depth and overall size potential of mineralized ore body identified from at-surface trenching work conducted by JV partner during 2015.
- Drill program to consist of approximately 100 holes for a total of 3,500 metres.
- Sahara Mining Services have been engaged to complete a NI43-101 resource estimate following the dril program.
- Independent Metallurgical Laboratories engaged to perform assaying and metallurgical test-work.
- Community consultation program instigated resulting in community support for the exploration and mining activities.