$TURV GCP 2 Gets Power Investor Update 12/28/16
Post# of 204
In the pictures below Main Electric Inc is installing the utility/electric service loop and overhead power lines connecting GCP1 and GCP2, for primary metering of the entire site, and to allow an increase of local utility service power.
In addition, they have delivered the 1,500 kva transformer and pad for installation at GCP2.
To see pictures/updates sign up at http://www.2riverswater.com/
Happy New Year!