Investors Hangout Stock Message Boards Logo
  • Mailbox
  • Favorites
  • Boards
    • The Hangout
    • NASDAQ
    • NYSE
    • OTC Markets
    • All Boards
  • Whats Hot!
    • Recent Activity
    • Most Viewed Boards
    • Most Viewed Posts
    • Most Posted
    • Most Followed
    • Top Boards
    • Newest Boards
    • Newest Members
  • Blog
    • Recent Blog Posts
    • Recently Updated
    • News
    • Stocks
    • Crypto
    • Investing
    • Business
    • Markets
    • Economy
    • Real Estate
    • Personal Finance
  • Market Movers
  • Interactive Charts
  • Login - Join Now FREE!
  1. Home ›
  2. Stock Message Boards ›
  3. User Boards ›
  4. BREAKOUTS..RUNNERS AND HOT PENNIES Message Board

News DLLFF Heavy Oil Project BY Marketwire -

Message Board Public Reply | Private Reply | Keep | Replies (0)                   Post New Msg
Edit Msg () | Previous | Next


Post# of 36140
Posted On: 12/13/2012 1:58:27 PM
Avatar
Posted By: Dead Cat Bouncer

News DLLFF




Heavy Oil Project


BY Marketwire - Canada
— 6:58 PM ET 12/12/2012


VANCOUVER, BRITISH COLUMBIA--(Marketwire - Dec. 12, 2012) - Deloro Resources Ltd. (DLLFF
















Loading... Loading...

) ("the Company") is pleased to announce receipt of a final interpretation report of a 3D seismic survey of the Wilkie Heavy Oil Project, in west-central Saskatchewan. The survey was commissioned by the Company and its partner Electro-Petroleum Inc. and completed in the spring of 2012 by RPS Boyd Petrosearch. Subsequently, data was processed by Key Seismic Solutions and interpreted by Canadian Discovery Ltd, both of Calgary, Alberta. The intention of the survey was to identify additional drilling locations for deployment of the EPI heavy oil recovery system and to better understand the results of the existing three wells.


Interpretation identified three prospective drilling locations, based on the presence of thick, continuous, high-porosity reservoir sand above known or interpreted oil/water contacts. The existing wells have been divided into four pools based on variations in oil/water contacts, although seismic interpretation of the sand presence and continuity implies that all pools within the 3D area are connected in some way. Channels are interpreted to be up to 39m thick. Proposed wells call for depths between 600-630m, with 400m horizontal legs.


Of the three deviated wells already drilled at the project Deloro lands, the 2010 and 2011 wells appear not to have reached the pools, having been abandoned at the top of the McLaren Channel. The horizontal producing well (known as the pilot well) also appeared to be mostly above the best quality McLaren sand, which explains the limited production.


Reza Mohammed, President, commented, "We are extremely pleased with the results of the data acquisition and interpretation. What is of particular interest is that that 'pilot well', which produced approx. 15 barrels/day with EPI stimulation appears not to have entered the main zone. Long-time shareholders will recall that the pilot well was a historic well retrofitted with the EPI system as a proof of concept. The Company's expectation is that if an EPI well is drilled optimally into the formation it should have significant production and be a game changer in the heavy oil space."


An excerpt from the Canadian Discovery Report states: "The main zone of interest is the channel facies of the McLaren Member of the Lower Cretaceous Mannville Group. This channel fairway consists of a complex arrangement of facies types due to original deposition and subsequent truncation by younger channels. A standard land-data 3D processing flow was applied with the addition of a pre-stack time migration (PSTM) for sharper focusing of structural and stratigraphic discontinuities. Petrophysical data from twenty-three wells were considered in the interpretation. One well with sonic and density logs and one well with only sonic (both vertical) were tied the 3D seismic. These wells were correlated with the corresponding seismic traces to create accurate depth-time correction curves for each well. The main geological horizons interpreted on the phase-rotated seismic were tied at the well locations and picked throughout the 3D. Faults were not interpreted, although they are clearly present and apparent as discontinuities on the Base Fish Scales horizon. Some are likely re-activated early Mannville or older as channel deposition orientation and limits appear to be controlled by structural elements."


The Company will be updating its website (http://www.deloro.ca) with additional information about the Wilkie Project and the EPI technology in the near term.


On Behalf of Deloro Resources Ltd. (DLLFF
















Loading... Loading...

)


Reza Mohammed, President


This news release shall not constitute an offer to sell or the solicitation of an offer to buy securities in any jurisdiction.


FOR FURTHER INFORMATION PLEASE CONTACT: 
Deloro Resources Ltd. (DLLFF

















Loading... Loading...



) 
604-681-0004
604-681-0014 (FAX)
www.deloro.ca

Neither TSX Venture Exchange





(0)
(0)








Investors Hangout

Home

Mailbox

Message Boards

Favorites

Whats Hot

Blog

Settings

Privacy Policy

Terms and Conditions

Disclaimer

Contact Us

Whats Hot

Recent Activity

Most Viewed Boards

Most Viewed Posts

Most Posted Boards

Most Followed

Top Boards

Newest Boards

Newest Members

Investors Hangout Message Boards

Welcome To Investors Hangout

Stock Message Boards

American Stock Exchange (AMEX)

NASDAQ Stock Exchange (NASDAQ)

New York Stock Exchange (NYSE)

Penny Stocks - (OTC)

User Boards

The Hangout

Private

Global Markets

Australian Securities Exchange (ASX)

Euronext Amsterdam (AMS)

Euronext Brussels (BRU)

Euronext Lisbon (LIS)

Euronext Paris (PAR)

Foreign Exchange (FOREX)

Hong Kong Stock Exchange (HKEX)

London Stock Exchange (LSE)

Milan Stock Exchange (MLSE)

New Zealand Exchange (NZX)

Singapore Stock Exchange (SGX)

Toronto Stock Exchange (TSX)

Contact Investors Hangout

Email Us

Follow Investors Hangout

Twitter

YouTube

Facebook

Market Data powered by QuoteMedia. Copyright © 2025. Data delayed 15 minutes unless otherwise indicated (view delay times for all exchanges).
Analyst Ratings & Earnings by Zacks. RT=Real-Time, EOD=End of Day, PD=Previous Day. Terms of Use.

© 2025 Copyright Investors Hangout, LLC All Rights Reserved.

Privacy Policy |Do Not Sell My Information | Terms & Conditions | Disclaimer | Help | Contact Us