New Post Public Reply Private Reply Replies (0) Message Board ← Newer Older → cherrob Aug 11, 2016 at 3:09 PM $ORRP The maximum values for Lithium and Boron in the dry surface sediments was 247 ppm and 634 ppm respectively, which were located directly at the WNB project area. Newer Older