Serabi Gold plc (“Serabi” or the “Company”) Second

New Post Public Reply Private Reply Replies (0) Message Board
News Desk 2018
Serabi Gold plc (“Serabi” or the “Company”) Second quarter update on gold operations at Palito and Sao Chico

LONDON, July 18, 2016 (GLOBE NEWSWIRE) -- Serabi Gold plc (AIM:SRB) (TSX:SBI), the Brazilian focused gold mining and development company, provides an operational update for the second quarter of 2016 on its wholly owned Palito and Sao Chico gold operations in the Tapajos region of Para State, Northern Brazil. 

HIGHLIGHTS

  • 9,896 ounces of gold produced for the second quarter of 2016 (Q1 2016 - 9,771 ounces).  
  • Mine production totalled 33,606 tonnes.
    •  25,198 tonnes at a grade of 10.48 grammes per tonne (g/t) of gold from Palito.
    •  8,408 tonnes at 6.81 g/t of gold from Sao Chico.  
  • 39,402 tonnes of ore processed through the plant for the combined mining operations.
  • 2,940 metres of horizontal mine development completed in the quarter with 1,910 metres completed at Palito and 1,031 metres at Sao Chico.
  • Installation of the third ball mill was completed during the quarter, with a second flotation line and enhancements in the carbon in pulp (“CIP”) plant close to completion.  The carbon regeneration kiln acquired earlier in the year is now being installed and will be commissioned during the current quarter.  The kiln will regenerate ‘fouled’ carbon and enhance gold recoveries.
  • Daily plant throughput can now be increased from 380-400 tonnes per day (tpd) to over 500 tpd, which is in excess of mined production allowing surface stocks to be depleted in the second half of the year.
  • Sao Chico is now being developed on the 156mRL, 140mRL, 128mRL and 116mRL levels, with production ore being mined from the 156mRL level. The ramp continues to be deepened from levels 116mRL to 100mRL, the next planned development level. 
  • During the second quarter, underground exploration drilling has commenced at Sao Chico.  A programme of approximately 6,000 metres is planned to test the down dip continuity of the central ore zone. The first hole, completed within the last seven days, reported an intersection of 46.2 g/t of gold over a drilled width of 2.32 metre, approximately 240 metres from surface and 100 metres down-dip from the current lowest developed level.
  • At the end of the second quarter, the combined surface stockpiles at Palito and Sao Chico totalled 12,000 tonnes at an average grade of 5.0 g/t of gold.
  • The Company remains confident of achieving its production forecast of 37,000 ounces of gold for the year.

The following link can be used to access an interview with Mike Hodgson, CEO discussing the second quarter operational results

https://www.brrmedia.co.uk/broadcasts-embed/578777f0cb9efc486f0be735/event/?livelink=true

Mike Hodgson, CEO, said:

“This has been another strong quarter of production, with a further improvement over what had been a very good first quarter.  It is very satisfying that we improved the gold production of the first quarter without the benefit of the third ball mill.  Having experienced a short delay in the commissioning of this mill, I am pleased to report it is now operational, but to exceed our target, again, with just two mills operating is a great success. 

“With production for each of the first two quarters being close to 10,000 ounces, we remain comfortably in-line to achieve our guidance of 37,000 ounces for the year. During the third quarter, we will have the additional benefit of the final plant enhancements, and we will use the additional plant capacity to further run down our surface stockpiles. 

“Palito continues to perform admirably, with mined grades for the quarter averaging over 10 g/t of gold which is consistent with most months since the operations began.  The introduction of two new mining sectors, Senna and Chico da Santa, are providing increased options for mining.  Underground mines, especially smaller ones, live or die by development and having multiple faces is the only way to establish stability and avoid the ‘boom-bust’ production that can otherwise often be a problem.  With four sectors of the mine now in development, as well as underground diamond drilling ongoing, we are establishing numerous new mining fronts, especially in the upper levels. These have the advantage of being in close proximity to existing mine infrastructure and will not require any new ramp development.

“At Sao Chico, ore development and production continue much as planned.  As explained last quarter, we have made a concerted effort to quickly deepen the ramp in the central zone to secure immediate production.  I am pleased to say we have made good progress and with the 156mRL, 140mRL, 128mRL and, 116mRL now all developed, we have secured the source of production for the remainder of 2016 and for 2017. 

“Additionally, underground exploration drilling at Sao Chico has commenced.  The purpose is to test the down dip continuation of the central ore shoot below the 100mRL as well as to the east and west along strike, areas which remain quite open.  Ore discoveries along strike have the obvious advantage that the ramp is already in place. The first drill hole completed within the past week recorded an intersection of 46.2 g/t of gold over a drilled width of 2.32m, located approximately 240 metres from surface and 100 metres down-dip from the current lowest developed level.  We are delighted with this result.

“As reported last quarter, the plant has now been expanded to allow the processing of the significant surface ore stockpiles.  These stockpiles were accumulated as a result of the initial limitations in the capacity of the gold processing plant.  We did experience a short delay in the commissioning of a third ball mill following the failure of a main bearing in mill number 2, but we were fortunate to be able to use the identical bearing from mill number 3 to keep the plant at full operational capacity.  This is not a usual breakdown, and whilst it delayed the commissioning of mill number 3 by one month, it illustrates the need for contingency when operating in relatively remote areas. Despite that setback we still achieved our forecast gold production. 

“With ball mill number 3 now operational and final plant improvements close to completion, current daily plant throughput can be increased from 380-400 tpdto over 500 tpd.  This is in excess of mine production levels, allowing surface stocks to be depleted during the second half of the year, and in the longer term the increased capacity establishes much needed contingency within the process plant”.  

Results

Total production for the second quarter of 2016 was 9,896 ounces(1) of gold, generated from the processing of the run of mine (“ROM”) ore from the Palito and Sao Chico Mines, combined with the Palito surface coarse ore and the stockpiled flotation tailings accumulated from Palito mine production in 2014.

Gold production for the second quarter came from the processing of 39,402 tonnes of hard rock ROM ore from the Palito and Sao Chico Mines with an average grade of 8.17 g/t of gold.  The total mined ore for the same period was 33,606 tonnes with an average grade of 9.56 g/t of gold.  In addition to the ROM ore, an additional 6,354 tonnes of flotation tailings with a grade of 2.80 g/t of gold was processed through the cyanidation plant.

At 30 June 2016, there were coarse ore stocks of approximately 12,000 tonnes with an average grade of 5.0 g/t of gold, and approximately 25,000 tonnes of flotation tails with an average grade of 2.5 g/t of gold. The plant expansion, with mill number 3 now operational, is virtually complete and will provide sufficient incremental capacity to process most of this stockpiled material during the remainder of 2016.     

Approximately 1,900 metres of horizontal development has been completed during the quarter at the Palito Mine, of which 943 metres is represented by ore development, with the balance being on the development of ramps, cross cuts and stope preparation. 

At the Sao Chico Mine a total of 1,031 metres of horizontal development was completed, of which 598 metres represents ore development, with much of the balance being ramp development and cross cuts reflecting the on-going deepening of the mine.  Mine production from Sao Chico was 8,408 tonnes of ore extracted, at a grade of 6.81 g/t of gold.  Most of this ore has been generated from development mining, however there will be a greater contribution of ore coming from production areas during the second half of the year. 

2016 Guidance

The Company expects to produce 28,000 ounces of gold during 2016 from the processing of Palito ROM and the Palito stockpiles.  With the Sao Chico Mine now under development, the Company also anticipates production of 9,000 ounces of gold from ore mined at Sao Chico, and as a result, with close to 20,000 ounces of gold production by mid-year, the Company remains confident of achieving its production forecast of 37,000 ounces of gold for the year.  Whilst we have forecast an All-In Sustaining Cost of between US$840 to US$870 per ounce, this guidance was predicated on a significantly weaker Brazilian Real at the beginning of the year. The Brazilian Real has strengthened against the US Dollar by approximately 20% since the start of 2016, much of which has occurred in this last quarter, and this will impact on our reported costs in US Dollars.  Commentators have been predicting a weakening of the Brazilian Real in the second half of 2016 and we will continually be reviewing our cost guidance to reflect the potential effects of changing exchange rates.

 SUMMARY PRODUCTION STATISTICS FOR THE SIX MONTHS ENDED 30 JUNE 2016 (Palito & Sao Chico)
   Quarter 1Quarter 2H1H1
2016201620162015
Horizontal development – PalitoMetres 1,9001,9103,8103,404
Horizontal development – Sao ChicoMetres 1,0251,0312,0561,058
Horizontal development - TotalMetres 2,9252,9415,8664,462
       
Mined ore – PalitoTonnes 26,75225,19851,95054,864
 Gold grade (g/t) 11.8410.4811.1810.17
Mined ore – Sao ChicoTonnes 10,7948,40819,2029,128
 Gold grade (g/t) 9.006.818.048.47
Mined ore – TotalTonnes 37,54633,60671,15263,992
 Gold grade (g/t) 11.029.5610.339.85
       
Milled oreTonnes 36,61539,40276,01763,662
 Gold grade (g/t) 8.588.178.378.36
Gold production (1)Ounces 9,7719,89619,66715,626


 (1)Gold production figures are subject to amendment pending final agreed assays of the gold content of the copper/gold concentrate and the gold bullion when smelting and refining processes are completed.
 (2)Gold production totals for 2016 include treatment of 11.053 tonnes of flotation tails
  

This announcement is inside information for the purposes of Article 7 of Regulation 596/2014.

Enquiries:

Serabi Gold plc 
Michael HodgsonTel: +44 (0)20 7246 6830
Chief ExecutiveMobile: +44 (0)7799 473621
  
Clive LineTel: +44 (0)20 7246 6830
Finance DirectorMobile: +44 (0)7710 151692
  
Email: contact@serabigold.com 
Website:  www.serabigold.com 
  
Beaumont Cornish Limited
Nominated Adviser and Financial Adviser
 
Roland CornishTel: +44 (0)20 7628 3396
Michael CornishTel: +44 (0)20 7628 3396
  
Peel Hunt LLP
UK Broker
 
Matthew ArmittTel: +44 (0)20 7418 8900
Ross AllisterTel: +44 (0)20 7418 8900
  
Blytheweigh
Public Relations
 
Tim BlytheTel: +44 (0)20 7138 3204
Camilla HorsfallTel: +44 (0)20 7138 3224
  

Copies of this announcement are available from the Company's website at www.serabigold.com.

Neither the Toronto Stock Exchange, nor any other securities regulatory authority, has approved or disapproved of the contents of this announcement.

GLOSSARY OF TERMS

The following is a glossary of technical terms:

 “Au” means gold.

 “assay” in economic geology, means to analyze the proportions of metal in a rock or overburden sample; to test an ore or mineral for composition, purity, weight or other properties of commercial interest.

“development” - excavations used to  establish access to the mineralised rock and other workings

“DNPM” is the Departamento Nacional de Produção Mineral.

“grade” is the concentration of mineral within the host rock typically quoted as grams per tonne (g/t), parts per million (ppm) or parts per billion (ppb).

“g/t” means grams per tonne.

“granodiorite” is an igneous intrusive rock similar to granite.

“igneous” is a rock that has solidified from molten material or magma.

“Intrusive” is a body of igneous rock that invades older rocks.

“on-lode development” - Development that is undertaken in and following the direction of the Vein

 “mRL” – depth in metres measured relative to a fixed point – in the case of Palito and Sao Chico this is sea-level.  The mine entrance at Palito is at 250mRL.

“saprolite” is a weathered or decomposed clay‐rich rock.

“stoping blocks” – a discrete area of mineralised rock established for planning and scheduling purposes that will be mined using one of the various stoping methods. 

“vein” is a generic term to describe an occurrence of mineralised rock within an area of non-mineralised rock.

Qualified Persons Statement
The scientific and technical information contained within this announcement has been reviewed and approved by Michael Hodgson, a Director of the Company. Mr Hodgson is an Economic Geologist by training with over 26 years' experience in the mining industry. He holds a BSc (Hons) Geology, University of London, a MSc Mining Geology, University of Leicester and is a Fellow of the Institute of Materials, Minerals and Mining and a Chartered Engineer of the Engineering Council of UK, recognising him as both a Qualified Person for the purposes of Canadian National Instrument 43-101 and by the AIM Guidance Note on Mining and Oil & Gas Companies dated June 2009.

Forward Looking Statements
Certain statements in this announcement are, or may be deemed to be, forward looking statements. Forward looking statements are identified by their use of terms and phrases such as ‘‘believe’’, ‘‘could’’, “should” ‘‘envisage’’, ‘‘estimate’’, ‘‘intend’’, ‘‘may’’, ‘‘plan’’, ‘‘will’’ or the negative of those, variations or comparable expressions, including references to assumptions. These forward looking statements are not based on historical facts but rather on the Directors’ current expectations and assumptions regarding the Company’s future growth, results of operations, performance, future capital and other expenditures (including the amount, nature and sources of funding thereof), competitive advantages, business prospects and opportunities. Such forward looking statements reflect the Directors’ current beliefs and assumptions and are based on information currently available to the Directors. A number of factors could cause actual results to differ materially from the results discussed in the forward looking statements including risks associated with vulnerability to general economic and business conditions, competition, environmental and other regulatory changes, actions by governmental authorities, the availability of capital markets, reliance on key personnel, uninsured and underinsured losses and other factors, many of which are beyond the control of the Company. Although any forward looking statements contained in this announcement are based upon what the Directors believe to be reasonable assumptions, the Company cannot assure investors that actual results will be consistent with such forward looking statements.

Scroll down for more posts ▼

Top 10 Most Recent News Articles

Lymphatic Research Gains Attention Beyond Wellness Claims

Updated Category News Views 201

Ankles leave little clues after a long day: sock grooves, puffiness, that dull heaviness nobody bothers to name. PureHealth Research wants people to look past the usual salt-and-water explanation and consider the lymphatic system, the body’s comparatively unsung network for gathering fluid from tissues and returning it to the bloodstream. Fair enough. This system does...

Continue Reading
Newegg’s GIGABYTE Event Is Brand Work, Not a Catalyst

Updated Category News Views 311

A 2,300-square-foot room can tell a retailer plenty about its tribe. On November 21, Newegg is turning its Diamond Bar Gamer Zone into the home base for GIGABYTE’s AORUS VS40 celebration, a free five-hour event marking the hardware maker’s 40th anniversary. There will be 1v1 VALORANT and League of Legends contests, demo stations, raffles, anniversary merchandise, food...

Continue Reading
Mission Inn’s Lights Enter a Tender New Ownership Era

Updated Category News Views 274

A holiday spectacle can outlive the hands that hung its first bulb. Riverside is about to test that truth in public, under millions of tiny lights and the very large shadow of a family departure. The Mission Inn Festival of Lights returns in 2026 without Kelly and Duane Roberts as hotel owners for the first time in more than three decades. Duane Roberts died in 2025, the...

Continue Reading
PettiChat’s Digital Pet Twin Has Real Consumer Pull

Updated Category News Views 173

A Collar Gadget Is Chasing the Empty-House Problem Leave a dog or cat alone for a few hours and plenty of owners turn into amateur detectives. Did the cat eat? Has the dog been pacing? Why was that one weird noise caught on the home camera? Seattle startup PettiChat is trying to turn that itch into a product category with PettiLive!, a screen-based version of a pet that...

Continue Reading
Human Frontier Mission Puts AI Research on Display

Updated Category News Views 162

A laboratory notebook is about to become the real product in this AI experiment. Human Frontier Mission, or HFM, says it will launch globally on Nov. 24, opening a research program where domain specialists frame scientific and engineering problems while autonomous AI agents develop and test possible answers. The unusual bit is not merely handing models difficult work. It...

Continue Reading
Ajman Memory Gives Heritage a Durable Digital Backbone

Updated Category News Views 138

Archives usually get applause only after somebody realizes a piece of history has vanished. Ajman is trying to skip that miserable part. During the Ajman Media Forum 2026, held November 18 and 19 at the Emirates Hospitality Centre, the emirate launched Ajman Memory, a project built to collect, document and preserve photographs, papers and video recording its development....

Continue Reading
Anthropic's Leveraged ETFs Arrive After Wild Debut

Updated Category News Views 411

Nothing says a feverish new listing quite like leveraged products lining up before the opening-week confetti has settled. Anthropic priced its IPO at $83 on November 18, raised roughly $81.3 billion, then opened Nasdaq trading at $111.50 on November 19. That is an enormous gap between IPO price and first trade, and it tells investors the obvious thing: plenty of appetite...

Continue Reading
D-Wave Investors Face a December 15 Lead Plaintiff Clock

Updated Category News Views 252

August Put the Story Under a Harsh Light Two ugly August trading sessions are doing a lot of work in the case now confronting D-Wave Quantum. The company sits in a field that attracts big dreams, big headlines, and, frankly, plenty of investor imagination. But imagination does not cushion a portfolio when expectations crack. The lawsuits concern people who bought or...

Continue Reading
PHONO's 150 MW RE+ Win Tests Its U.S. Solar Staying Power

Updated Category News Views 237

A trade-show order book is not cash in the bank, but 150 MW is still a number worth circling in red. PHONO used RE+ 2026 in Las Vegas, held November 17 through 19, to celebrate 20 years in business, parade its solar and storage lineup, and announce new U.S. orders. In a solar market that has become touchier about provenance, compliance and delivered economics, the company...

Continue Reading
WaterField’s Nova Case Bets on Better Handheld Carry

Updated Category News Views 308

Tiny handhelds have spawned a surprisingly fussy luggage problem: protection without the clown-show aesthetic. WaterField Designs is taking a clean swing at that with a custom case for the Retroid Pocket Nova, a sleeve-like carrier built around the device rather than some generic pouch that leaves everything rattling around inside. This is not a market-moving corporate...

Continue Reading

Top 5 Most Recently Viewed Articles

Robinhood Markets Shares November 2025 Operational Highlights

Updated Category News Views 269

Robinhood Markets Releases November 2025 Operational Highlights Robinhood Markets, Inc. (“Robinhood”) (NASDAQ: HOOD) has recently shared its monthly operating data for November 2025, offering an insightful look into its operational metrics and customer engagement. This report emphasizes key growth indicators and trading volume achievements over the month, reflecting...

Continue Reading
Gold Prices Decline Amid Anticipation of Federal Reserve Actions

Updated Category News Views 140

Gold Prices Drop as Federal Reserve Meeting Commences Gold prices experienced a decline as traders adjusted their positions ahead of the Federal Reserve's crucial meeting. The latest updates signal a decrease in spot gold prices, which now hover around $2,646.06 an ounce. Similarly, gold futures, set to expire in February, showed a minor drop to $2,662.44 an ounce. This...

Continue Reading
Understanding Adobe's Current Stock Performance Analysis

Updated Category News Views 239

Market Dynamics of Adobe Inc. Investors are taking a closer look at Adobe Inc (NASDAQ: ADBE) as they adopt varying strategies in the options market. Notably, deep-pocketed investors have shown bearish tendencies, making it a key point of interest for those monitoring market movements. Recent observations have highlighted an unusual upsurge in options activities related to...

Continue Reading
NexPoint Diversified Real Estate Trust's New Preferred Share Offering

Updated Category News Views 212

NexPoint Diversified Real Estate Trust Announces Major Offering NexPoint Diversified Real Estate Trust (NYSE: NXDT), a leading player in the real estate investment trust sector, has unveiled an opportunity for investors with a continuous public offering of its 9.00% Series B Cumulative Redeemable Preferred Shares. With a planned issuance of up to 16,000,000 shares, the...

Continue Reading
Outbrain Dominates the Q4 2024 France Ad Seller Rankings

Updated Category News Views 185

Outbrain Leads the Way in France's Q4 2024 Ad Rankings In a recent release, Pixalate has highlighted the leading programmatic ad sellers in France for the fourth quarter of 2024. This report emphasizes the importance of quality within the digital advertising ecosystem, offering a glimpse into the companies making significant strides in this sector. Understanding the...

Continue Reading