I never said TPAC was proving their self. I said
Post# of 22940
This SLA does not go into effect till 2017. At that time if the deal is still on TPAC will need to file an 8K for material event. That event would be a 12.5 million payment from BSM. IMO the delay is to allow BSM time to see if they can generate orders to make the SLA profitable. If not then Im sure they will back out of the SLA. They always have a clause in the SLA for said events.