Update:
MyEcheck
5 mins ·
We're connecting the system back on NIP v.1 since v.2 is still delayed, this should be done tomorrow. They can then get the final sign off for a launch date.
MyEcheck
5 mins ·
We're connecting the system back on NIP v.1 since v.2 is still delayed, this should be done tomorrow. They can then get the final sign off for a launch date.