I went down to Buffalo Ranch after work on Friday. I missed the pour but I did get to snap a pick of the footings all poured and tucked away for the evening in thermal blankets. Workers for the most part were gone but I had the good fortune to find Delmar Janovec still on site.
The stem wall for the greenhouse will be framed up on Saturday and the footings for the headhouse will be framed up on Monday. Both will be poured on Tuesday as long as the weather holds.
to the left of these already poured footings in that flat space is where the headhouse will be. The footings are already dug for that. You can also see the Greenhouse building in the top left hand corner. Lot's of progress being made on the fence also as you can see in the background.
I didn't want to resize the picture so you have to scroll down to see it due to the right side menu advertising. I just think the full size pic is worth the effort