The driller that day told me it was a 30 to 40 gallon a minute well. Last Friday when I went by there was about 1000 tons of fill that had been brought in for the foundations and they were excavating what looked like about 7500 sq ft of ground .
My assumption would be that they are going to use the fill compact it and then pour slabs for the buildings
I can't get over there today but will for sure tomorrow even if I have to sneak out of the office a little early
(0)
(0)
Xtreme One Entertainment Inc. (XONI) Stock Research Links