Golden Predator Announces Stock Option Grant
Filing Services Canada - Fri Oct 02, 6:54AM CDT
Golden Predator Announces Stock Option Grant
GPY.VN: 0.120 (unch)
Golden Predator Arranges CDN$300,000 Line of Credit
Filing Services Canada XHTML - Wed Sep 30, 7:02AM CDT
GPY.VN: 0.120 (unch), TIL: 4.30 (+0.20)
IIROC Trade Resumption - Golden Predator Mining Corp.
Newsfile Corp - Mon Sep 14, 12:29PM CDT
Trading resumes in:
IIROC Trading Resumption - GPY
CNW Group - Mon Sep 14, 12:29PM CDT
Trading resumes in:
GPY.VN: 0.120 (unch)
Golden Predator Confirms Continuity of High Grade Gold from Surface at 3 Aces’ Bulk Sample Target, Intersects 4.64 oz/t (158.97 g/t) Gold over 7.5 Feet
Filing Services Canada XHTML - Mon Sep 14, 12:25PM CDT
GPY.VN: 0.120 (unch)
Golden Predator Confirms Continuity of High Grade Gold from Surface at 3 Aces' Bulk Sample Target, Intersects 4.64 oz/t (158.97 g/t) Gold over 7.5 Feet
Filing Services Canada - Mon Sep 14, 12:25PM CDT
Golden Predator Confirms Continuity of High Grade Gold from Surface at 3 Aces Bulk Sample Target, Intersects 4.64 oz/t (158.97 g/t) Gold over 7.5 Feet Vancouver, British Columbia (FSCwire) - Golden Predator Mining Corp. (TSX.V: GPY) (the Company or Golden Predator) is pleased to announce the Company has completed a tightly spaced Rotary Air Blast (RAB) drill program confirming gold mineralization in advance of bulk sampling from the Sleeping Giant vein at the 3 Aces project. Gold mineralization was intersected in all holes sampled at or near the surface, including: Hole 3ARAB15-11 with 2.5 ft from surface of 9.73 oz/t (333.50 g/t) gold; Hole 3ARAB15-05 with 2.5ft from surface of 6.84 oz/t (234.50 g/t) gold; Hole 3ARAB15-12 with 7.5ft from surface of 3.04 oz/t (104.39 g/t) gold; and Hole 3ARAB15-13 with 7.5 ft from surface of 4.64 oz/t (158.97 g/t) gold RAB Drill Program A total of 13 shallow holes totaling 150 ft (45.73m) were drilled in preparation for bulk sampling from the Sleeping Giant vein. Drill samples were collected downhole at 2.5 ft (0.76m) intervals on an irregular grid (see map) covering an area of approximately 50 ft by 20 ft (15.24m by 6.10m) with hole depths ranging from 6.5 ft (1.98m) to 13.5 ft (4.12m). Drill holes were collared in the outcropping vein (hanging wall) where exposed from earlier trench and road work, and oriented for true-width intersection. Drill holes were designed to collect a large volume sample, varying from 17.6 pound to 63.8 pounds (8 to 29 Kg), and were capped for use in blasting of the planned bulk sample. Drill holes 3ARAB15-01 and 10, located at the eastern end of the drilled section of the vein intersected a moderately dipping fault which cuts off the vein. All other drill holes were terminated in the quartz vein at the planned depth for blasting of the initial bulk sample. Holes 09 and 10 were collared in argillite and were not sampled until the vein was intercepted substantiating the continuation of the vein beneath the argillite. The western portion of the vein was not able to be drilled due to topographic constraints and remains open. The drilling program was designed to test a portion of the Sleeping Giant vein where previous channel sampling by Golden Predator (formerly Northern Tiger Resources Ltd.) returned grades up to 3.88 oz/t (132.91 g/t) gold over 22.63 feet (6.9 m)(1), and metallurgical testwork from a 1,366 pound (620kg) sample (sample BS-3A13-03) that returned a metallic screen gold assay of 6.29 oz/t (215.5 g/t) gold and reported gravity recoverable gold of 78.9% and overall gold recovery of 97.9%(2). To view this table, please either click on the link below, or copy and paste the link into your browser: Drill intercepts are reported as true thickness intervals. Au grades are reported in troy ounces per short ton Au grades are reported in grams per metric tonne To view this image, please either click on the link below, or copy and paste the link into your browser: To view this image, please either click on the link below, or copy and paste the link into your browser: Sleeping Giant Zone The Sleeping Giant Zone, accessible via an exploration dirt road, encompasses an area approximately 33,000 m2 defined by float and outcrops of quartz veins. To date, it contains one of the 3 Aces propertys two preferred continuous quartz veins offering potential for bulk sampling. The Zone consists of a number of outcropping targets consisting of gently to moderately dipping gold-bearing quartz veins. Located along the road cut on the southern part of the Sleeping Giant Zone, the veins apparent dip slope is exposed for about 25m along strike on the north side of the road. 2015 Bulk Sample Program After evaluation of the current drilling results, the Company has refined its plan for the bulk sample at the Sleeping Giant Zone where it now expects to initially extract and ship approximately 550 short tons (500 tonnes) of high grade vein material. The program is anticipated to target the top 2.5 feet (0.76m) to 7.5 feet (2.29m) of the vein as dictated by 3-D analysis of the RAB drill results. The Company may continue to extract additional tonnage within the confines of our permit at the Sleeping Giant vein based on conditions and grade encountered following the initial blast and extraction. The bulk sample will be conducted in a manner attempting to preserve any possible occurrences of specimen value rock prior to bagging the broken sample into super sacks designed for shipping the ore to a processing facility. The material will be transported off site and is planned to be processed in its entirety to not only recover gold but to further advance the Companys understanding of the distribution of the coarse gold particles and provide additional baseline data that can be used in designing a process flow sheet for this type of material. The Company is engaged in logistical planning and negotiating potential processing options. The Company has a Class 3 exploration permit allowing up to 2,000 cubic meters (approx. 5,000 tonnes) of bulk sampling. 3 Aces Project, Yukon The 3 Aces property consists of 1,118 contiguous quartz claims (23,000 hectares) located in southeast Yukon. The property is located along the all-season Nahanni Range Road which accesses the Cantung Mine located 40 kilometres to the north. The 3 Aces property contains a number of quartz veins and vein zones that cut Cambrian aged limestone, shale, quartz grits and pebble chert conglomerates of the Hyland Group. Previous sampling and exploration by Golden Predator (formerly Northern Tiger) has outlined extensive gold-in-soil anomalies over nine square kilometres, including numerous high grade gold showings. The 3 Aces property is located in the traditional territory of the Kaska Nation. In January 2013, Golden Predator signed an Exploration Agreement with the Kaska Nation, as represented by the Ross River Dena Council and the Liard First Nation, with respect to activities within their traditional territories. Sampling Methodology, Quality Control and Assurance The RAB sampling was conducted under the direct supervision of Mike Burke, Chief Geologist for Golden Predator. Fifty individual samples were collected, bagged, security-tagged and maintained in Company custody until delivery to ALS Whitehorse sample preparation facility. Previous metallurgical work(2) established that a 2,000 gram pulp and screen metallic assaying is an appropriate method to obtain reliable gold grades from the high grade gold veins. All analyses for the drill samples from the 2015 program were performed by ALS with sample preparation in Whitehorse, YT and assaying in North Vancouver, BC. Two one kilogram splits were collected from each drill sample and were analyzed for gold using Screen Metallics Gold (Au-SCR21) procedure. Reported grades are the average of the two splits. No field-split samples were submitted and samples consisted entirely of whole interval cuttings. Quality control and assurance consisted of 7% laboratory duplicates. No standard reference materials were analyzed in conjunction with the drill samples. The RAB sampling results are consistent with previous results (1)(2) and considered of sufficient quality for internal bulk sampling feasibility and planning purposes. The technical content of this news release has been reviewed and approved by Mark C. Shutty, CPG, a Qualified Person as defined by National Instrument 43-101 and a consultant for the Company. Golden Predator Mining Corp. Golden Predator Mining Corp. holds the Brewery Creek Project, a past producing heap leach gold mine with a preliminary economic assessment delivered in Q4 2014. The Company also holds the 3 Aces Gold Project in the Yukon, which it continues to delineate and test, and the Castle West Project in Nevada. For additional information: Janet Lee-Sheriff Chief Executive Officer (208) 446-6451 info@goldenpredator.com (mailto:info@goldenpredator.com) www.goldenpredator.com (http://www.goldenpredator.com) Northern Tiger Resources Inc., News Release dated August 8, 2012 Golden Predator Mining Corp., News Release dated December 2, 2014 Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein. This press release contains projections and forward-looking information that involve various risks and uncertainties regarding future events. Such forward-looking information can include without limitation statements based on current expectations involving a number of risks and uncertainties and are not guarantees of future performance. There are numerous risks and uncertainties that could cause actual results and the Companys plans and objectives to differ materially from those expressed in the forward-looking information. Actual results and future events could differ materially from those anticipated in such information. These and all subsequent written and oral forward-looking information are based on estimates and opinions of management on the dates they are made and are expressly qualified in their entirety by this notice. Except as required by law, the Company assumes no obligation to update forward-looking information should circumstances or management's estimates or opinions change. To view this press release as a PDF file, click onto the following link: http://fscwire.com/sites/default/files/news_r...142015.pdf Source: Golden Predator Mining Corp (TSX Venture:GPY) http://www.goldenpredator.com Maximum News Dissemination by FSCwire. http://www.fscwire.com Copyright(C)2015 Filing Services Canada Inc.
GPY.VN: 0.120 (unch)
IIROC Trading Halt - GPY
CNW Group - Mon Sep 14, 8:17AM CDT
The following issues have been halted by IIROC:
GPY.VN: 0.120 (unch)
IIROC Trade Halt - Golden Predator Mining Corp.
Newsfile Corp - Mon Sep 14, 8:11AM CDT
The following issues have been halted by IIROC:
Golden Predator Announces Re-Election of Board at Annual General Meeting
Filing Services Canada - Thu Sep 10, 2:41PM CDT
Golden Predator Announces Re-Election of Board at Annual General Meeting Vancouver, British Columbia (FSCwire) - Golden Predator Mining Corp. (TSX.V: GPY) (the Company or Golden Predator) is pleased to announce the election of managements slate of nominees to the Companys board of directors at its Annual General and Special Meeting held September 4, 2015. With over 95% support from the 48.7% of the outstanding common shares voted, the following were elected to the Companys board of directors: William M. Sheriff Dennis Fentie Piers McDonald Jesse Duke Greg Hayes Bradley M. Thiele Barry Rayment Golden Predator Mining Corp. Golden Predator Mining Corp. holds the Brewery Creek Project, a past producing heap leach gold mine with a preliminary economic assessment delivered in Q4 2014. The Company also holds the 3 Aces Gold Project in the Yukon, which it continues to delineate and test, and the Castle West Project in Nevada. For additional information: Janet Lee-Sheriff Chief Executive Officer (208) 446-6451 info@goldenpredator.com (mailto:info@goldenpredator.com) www.goldenpredator.com (http://www.goldenpredator.com) Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. To view this press release as a PDF file, click onto the following link: http://www.fscwire.com/sites/default/files/ne...102015.pdf Source: Golden Predator Mining Corp (TSX Venture:GPY) http://www.goldenpredator.com Maximum News Dissemination by FSCwire. http://www.fscwire.com Copyright(C)2015 Filing Services Canada Inc.
GPY.VN: 0.120 (unch)
Golden Predator Announces Board and Management Appointments; Provides Annual General Meeting and Corporate Update
Filing Services Canada XHTML - Wed Sep 02, 1:15PM CDT
GPY.VN: 0.120 (unch), TIL: 4.30 (+0.20)
Till Capital Reports on Golden Predator Annual General Meeting
GlobeNewswire - Mon Aug 24, 11:07AM CDT
Till Capital Ltd. (NASDAQ:TIL) (TSX.V:TIL) (the "Company" or "Till"
GPY.VN: 0.120 (unch), TIL.VN: 5.300 (+0.120), TIL: 4.30 (+0.20)
Golden Predator Board and Officers Resign
Filing Services Canada - Fri Aug 21, 8:03AM CDT
Golden Predator Board and Officers Resign Vancouver, British Columbia (FSCwire) - Golden Predator Mining Corp. (TSX.V: GPY) (the Company or Golden Predator) announces that 5 of its directors and all officers have tendered their resignation effective at the end of the business day on August 20th, 2015. Additionally, all of managements resigning board nominees have withdrawn their names for election at the Companys upcoming annual and special general meeting of shareholders (AGM) scheduled to be held August 21, 2015 in Vancouver, BC. The resignations follow the Companys receipt of notice from its largest shareholder, Till Capital Ltd. (TIL:TSXV; TIL:NASDAQ), that Till Capital intends to put forward for nomination at the AGM, and vote all of the Class A common shares, held by it, in favor of an alternate slate of directors comprised of the existing directors of Till Capital. Till Capital Ltd. is a Bermuda-domiciled insurance company and holds 18,912,155 Class A common shares, or 58.9% of the Companys issued and outstanding shares under its Bermuda-domiciled subsidiary, Resource Re Ltd. A copy of the notice, including the name and brief background of each Till Capital nominee, is linked to this release: (http://fscwire.com/sites/default/files/clientfiles/GoldenPredator/goldenpred08202015pdf.pdf (http://fscwire.com/sites/default/files/clientfiles/GoldenPredator/goldenpred08202015pdf.pdf)). Despite challenging commodity market conditions, the outgoing board and management team, which has over 100 combined years of experience in mineral exploration in addition to over 120 combined years of Yukon experience, assembled and advanced a valuable portfolio of projects, including the Brewery Creek Project in which they successfully expanded resources and negotiated a Socio- Economic Agreement with the Trondek Hwechin and additionally successfully negotiated an exploration agreement and accord with the Kaska Nation. The outgoing management team has worked extensively with Yukon communities, Yukon First Nations, local and regional governments in establishing strong relationships and identifying opportunities to maximize socio-economic benefits including local wealth creation, contracts, employment and training as a fundamental step in positioning its projects for successful permitting and development in preparation for improved market conditions. The Company has consistently strived to act with best practices and as an industry leader with its First Nation agreements and protocols. Through unique partnerships, as Yukoners and Yukon supporters, mining can have a healthy and positive lasting effect in Canadas North. We look forward to finding new ways for all of us to continue to work to be advocates for positive development in the Yukon and for alternate ways to build local shareholder and community wealth within the resource sector. Thank you for all your support over the past seven years, said former Chairman, William Sheriff, on behalf of the Board. The following have resigned effective Thursday, August 20, 2015: Board Members William M. Sheriff Dennis Fentie Piers McDonald Jesse Duke Greg Hayes Barry Rayment (proposed nominee) Chief Financial Officer Greg Hayes Chief Executive Officer Janet Lee-Sheriff Other Business In addition, the Company has entered into a loan agreement with William M. Sheriff pursuant to which the Company has agreed to repay a shareholder loan in the amount of CDN$79,000 advanced on July 30th, 2015. The loan will mature on December 31, 2015 and bear interest at a rate of 12% until repaid (in each case compounded quarterly). Repayment will be secured by the Companys interest in the Sonora Gulch property located in Yukon, Canada and a 1994 Hitachi Excavator located in Yukon, Canada. The Company used the proceeds to repay outstanding Till Capital related invoices and for general working capital. Golden Predator Mining Corp. Golden Predator Mining Corp. holds the Brewery Creek Project, a past producing heap leach gold mine with a preliminary economic assessment delivered in Q4 2014. The Company also holds the 3 Aces Gold Project in the Yukon, which it continues to delineate and test, and the Castle West Project in Nevada. For additional information: Janet Lee-Sheriff Chief Executive Officer (778) 847-3351 info@goldenpredator.com (mailto:info@goldenpredator.com) www.goldenpredator.com (http://www.goldenpredator.com) Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein. This press release contains projections and forward-looking information that involve various risks and uncertainties regarding future events. Such forward-looking information can include without limitation statements based on current expectations involving a number of risks and uncertainties and are not guarantees of future performance. There are numerous risks and uncertainties that could cause actual results and the Companys plans and objectives to differ materially from those expressed in the forward-looking information. Actual results and future events could differ materially from those anticipated in such information. These and all subsequent written and oral forward-looking information are based on estimates and opinions of management on the dates they are made and are expressly qualified in their entirety by this notice. Except as required by law, the Company assumes no obligation to update forward-looking information should circumstances or management's estimates or opinions change. To view this press release as a PDF file, click onto the following link: http://www.fscwire.com/sites/default/files/ne...2015_0.pdf Source: Golden Predator Mining Corp (TSX Venture:GPY) http://www.goldenpredator.com Maximum News Dissemination by FSCwire. http://www.fscwire.com Copyright(C)2015 Filing Services Canada Inc.
GPY.VN: 0.120 (unch), TIL: 4.30 (+0.20)