Ing. Julio Saul Yabar Pacheco - Highlights -Civ
Post# of 5115
-Civil Engineer with Post-grade Studies in the University of Padua Italy.
-International Consultant of Energy and Mining Projects, to the date
-Director of Mega Projects in hydroelectric Power Generation such as Pucara, and Molloco 2004 to 2010.
-Director of the National Peruvian Society of Mining, Oil and Energy (fir the last 2 terms – from 2012-2016)
-Owner of a Construction Company offering EPC Contracts for the Construction and Energy Sector.
-Vice-President on behalf of the Peruvian Government for the Reconstruction Fund of the South from 2008 to 2010.
-Director of PETRO PERU from (National Peruvian Oil Company, Período 2006 – 2008).
Asesor del Presidente de la República del Perú en Proyectos de Irrigación, Energía y Petróleo (Periodo 1985 – 1987)
Director for South America for Lahmeyer International (Period 1998 -2003)
Adviser of the President of Peru in irrigation, Energy and Oil (period1985 to 1987).
Operations Manager of Abengia Peru and Member of the Board of Directors (Period 2004 - 2010)
Executive director of the Reconstruction Authority for the Sydro electrical Project of Chira Piura
(1980 a 1984).
The Joint Venture immediately has two power plants to build with an equity position on the PPA. These two projects will give the Joint Venture 1) project for $47milion dollars in EPC revenue and the 2nd project for $11millions dollars in EPC revenue with a 15 year PPA. "EPC-Engineering Procurement & Construction."This is not a bid, these project are Mr. Yabar's projects he brought to the team.
This Joint Venture alliance will allow World Oil Group, Inc.'s MDN Peru to have access to bid on government tenders by having the EPC license by and through IAGESA and in reverse it will allow IAGESA to bid on government tenders for projects requiring heavy equipment/cranes for its power plant and mining projects. This combination allows for WOGI- South America, S.A.A. to become a Turn Key Contractor with in the region covering the main items need to accomplish large scale projects such as these.
WOGI-SA- Power Plant Projects
Project #1 Cusco
Total installed capacity 28 MW in cascade (6MW, 8MW and 14MW)
6km pressure pipe for each unit in cascade for a total of 18 Km and a 0.3 Km tunnel for the 14MW hydro plant
Capacity factor 69.3%
Expected yearly production 176.7 GWh
Hydrology studied over 124 years
Project data reviewed and verified by POYRY
Studies available upon request for detailed due diligence (an executed NDA is required)
Expected returns 16.7 %IRR
Renewable PPA for 15 years
TOTAL EST. COST USD 53.2 Million (EPC estimated cost: USD 47 Million)
Construction period 18 months
Project # 2- Outside Lima
Location Near Lima (see map)
Installed capacity 6.5 MW
Tunnel 1.4 Kms / Channel length 0.5 Km
Capacity factor 64.7%
Expected yearly production 50.7 GWh
Hydrology studied over 36 years
Project data reviewed and verified by Lombardi SPA
Studies available upon request for detailed due diligence (an executed NDA is required)
Expected returns 17.7 %IRR
Renewable PPA for 15 years
TOTAL EST. COST USD 12.4 Million (EPC estimated cost USD 11 Million)
Construction period 15 months
Moon Equity Hldgs Corp (MONI) Stock Research Links
My Favorite Paid chat room with amazing chart setups is The Trading Stock Lounge http://www.thetradingstocklounge.com/