The Tanumbirini #1 well that Santos just drilled
Post# of 71
"In 2013, Santos completed a 500-kilometre 2D seismic survey over the EP 161 permit, with initial results encouraging.
The Tanumbirini-1 exploration well, located in EP 161, was spudded in June 2014 and was drilled to a total depth of 3,945 metres. Multiple thick intervals of organic-rich rock have been intersected at the primary objective Mid-Velkerrie level, accompanied by significant mud gas shows. Elevated gas readings were encountered over a total gross interval in excess of 500 metres. A 90 metre core was taken and extensive wireline evaluation conducted. The well is being cased and suspended for re-entry in 2015."
http://www.tamboran.com/operations/#Australia