SHAMARAN 2014 YEAR END FINANCIAL AND OPERATING RESULTS

New Post Public Reply Private Reply Replies (0) Message Board
News Desk 2018
SHAMARAN 2014 YEAR END FINANCIAL AND OPERATING RESULTS

March 13, 2015 - ShaMaran Petroleum Corp. ("ShaMaran" or the "Company") (TSX VENTURE: SNM) (NASDAQ OMX: SNM) is pleased to announce its financial and operating results for the year ended December 31, 2014. Unless otherwise stated all currency amounts indicated as “$” in this news release are expressed in thousands of United States dollars.

HIGHLIGHTS

Production Facilities

  • Implementation of the 30,000 bopd Phase 1 Chiya Khere production facility is in progress. The civil construction site preparation work for the facility was completed in the final quarter of 2014 and work i s continuing on foundations for the individual units. Main production modules for the facility are being fabricated with onsite delivery expected during the second quarter of 2015 .
  • Front End Engineering and Design (“FEED”) on a dedicated feeder pipeline between the Chiya Khere production facility and the main Khurmala to Fishkabur export pipeline was completed during 2014. Initial work on the pipeline right of way in the elevated section over the Chiya Khere mountain has commenced.

Well Results

  • The Atrush-3 appraisal well flowed with a maximum oil rate of 4,900 bopd of 14° API oil using an electrical submersible pump during testing conducted in January 2015 in connection with well re-entry operations. The well was originally drilled in 2013.
  • The Chiya Khere-6 (“CK-6”) eastern appraisal well was drilled to a total depth (“TD”) of 2,105 meters which was reached in November 2014. During subsequent testing the well flowed with a maximum oil rate of over 6,700 bopd of 26.6° API oil using an electrical submersible pump.
  • The Chiya Khere-8 (“CK-8”) development well was drilled from the same well pad used for the Atrush-1 (“AT-1”) well discovery to a TD of 2,195 metres, which was reached in September 2014. The well has been suspended as a Phase 1 producer, pending testing and completion planned in early 2015. 
  • The Chiya Khere-5 (“CK-5”) development well was drilled from the same well pad used for the AT-1 well discovery to a TD of 2,098 metres, which was reached in June 2014. The well has been suspended as a Phase 1 producer, pending testing and completion planned in early 2015.
  • The Atrush-4 (“AT-4”) appraisal and development well was drilled to a TD of 2,916 metres which was reached in January 2014.  The well flowed with a combined rate of 9,059 bopd of 27-28° API oil from two intervals. AT-4 has been suspended as a Phase 1 producer.

Corporate

  • The Company reports Atrush Block gross 2P reserve estimates of 61 MMbbls (2013: 58 MMbbls) as well as Atrush Block gross contingent resource estimates of 310 MMboe 2C (2013: 404 MMboe) as of December 31, 2014.
  • ShaMaran raised gross funds of CAD 75.4 million through the issuance of an aggregate of 754,214,990 common shares of the Company in February 2015. The shares were issued further to an offering of rights to existing shareholders of the Company to purchase shares of ShaMaran at an exercise price of CAD 0.10 per share.
  • Mr. Chris Bruijnzeels has been appointed as the President and Chief Executive Officer of ShaMaran and both Mr Bruijnzeels and Mr. C. Ashley Heppenstall have been appointed as members of ShaMaran’s Board of Directors. The appointments were effective January 19, 2015.
  • $150 million of senior secured bonds issued by General Exploration Partners, Inc. (“GEP”), a wholly owned subsidiary of the Company, were listed on the Oslo Børs in Norway in May 2014. The ticker for the bonds is “GEP01”.

FINANCIAL AND OPERATING RESULTS FOR THE YEAR ENDED DECEMBER 31, 2014

During the reporting period the Company continued its appraisal and development campaign in respect of the Atrush petroleum property located in the Kurdistan Region of Iraq which constitutes the continuing operations of the Company.  Atrush currently generates no revenues.

The Company has reported in 2014 a net loss of $7.0 million which was primarily driven by routine general and administrative expenses, share based payment expenses and finance cost, the substantial portion of which was expensed borrowing costs on the Company’s senior secured bonds. These charges have been offset by a gain on the release of excess site restoration provisions associated with the Company’s discontinued operations in the United States.

Consolidated Statement of Comprehensive Income

(Audited, expressed in thousands of United States Dollars)

      For the year ended December 31,
        2014     2013
 
Expenses from continuing operations
             
General and administrative expense       (1,548)     (2,393)
Share based payments expense       (307)     (882)
Depreciation and amortisation expense       (53)     (65)
Impairment loss       -     (84)
Loss before finance items and income tax expense       (1,908)     (3,424)
Finance income       108     28
Finance cost       (5,304)     (740)
Net finance cost       (5,196)     (712)
Loss before income tax expense       (7,104)     (4,136)
Income tax expense       (109)     (87)
Loss from continuing operations       (7,213)     (4,223)
Discontinued operations              
Net income from discontinued operations       213     935
Loss for the year       (7,000)     (3,288)
Other comprehensive (loss) / income :              
Currency translation differences       (92)     19
Total other comprehensive (loss) / income       (92)     19
               
Total comprehensive loss for the year       (7,092)     (3,269)

Consolidated Balance Sheet

(Audited, expressed in thousands of United States Dollars)

                                  As at December 31,
    2014 2013
 
Assets
       
Non-current assets        
Intangible assets     429,277 344,990
Property, plant and equipment     172 179
      429,449 345,169
Current assets        
Cash and cash equivalents     57,204 142,588
Other current assets     1,605 194
      58,809 142,782
Assets associated with discontinued operations     - 3
Total assets     488,258 487,954
         
 
Liabilities and equity
       
Current liabilities        
Accounts payable and accrued expenses     14,207 7,458
Accrued interest expense on bonds     2,252 2,252
Current tax liabilities     41 92
      16,500 9,802
Non-current liabilities        
Borrowings     147,657 147,050
Provisions     1,846 1,185
      149,503 148,235
Liabilities associated with discontinued operations     51 928
Total liabilities     166,054 158,965
Equity        
Share capital     534,068 534,068
Share based payments reserve     5,025 4,718
Cumulative translation adjustment     (65) 27
Accumulated deficit     (216,824) (209,824)
Total equity     322,204 328,989
Total liabilities and equity     488,258 487,954

Intangible assets increased during the year 2014 by $84.3 million, which was substantially all related to additions to E&E assets comprised of Atrush drilling and field development activity costs totalling $68.4 million, borrowing costs capitalised of $12.6 million which relate to the financing of the Atrush development project, and general and administrative costs relating to Atrush Block E&E activities totalling $3.3 million.


Consolidated Cash Flow Statement

(Audited, expressed in thousands of United States Dollars)

    For the year ended December 31,
      2014     2013
 Operating activities            
 Net loss from continuing operations     (7,213)     (4,223)
 Adjustments for:            
Interest expense on senior secured bonds - net     5,286     689
Share based payments expense     307     882
Depreciation and amortisation expense     53     65
Impairment loss     -     84
Foreign exchange (gain) / loss     (43)     49
Interest income     (65)     (28)
Changes in accounts payable and accrued expenses     6,749     431
Changes in provisions     661     1,065
Changes in inventories     -     114
Changes in current tax liabilities     (51)     2
Changes in other current assets     (1,411)     137
 Cash used in discontinued operations     (661)     (78)
 Net cash inflows from / (outflows to) operating activities     3,612     (811)
 Investing activities            
Interest received on cash deposits     65     28
Repayment of deferred liability     -     (5,000)
Purchase of property, plant and equipment     (81)     -
Purchases of intangible assets     (71,682)     (39,788)
 Net cash outflows to investing activities     (71,698)     (44,760)
 Financing activities            
Proceeds on bond issue     -     150,000
Bond related transaction costs     -     (3,028)
Interest payments to bondholders     (17,250)     -
 Net cash outflows to financing activities     (17,250)     146,972
             
Effect of exchange rate changes on cash and cash equivalents     (48)     (29)
             
 Change in cash and cash equivalents     (85,384)     101,372
 Cash and cash equivalents, beginning of the year     142,588     41,216
 Cash and cash equivalents, end of the year     57,204     142,588

The decrease by $85.4 million in the cash position of the Company during the year ended December 31, 2014 was due to cash outflows of $71.7 million on Atrush Block appraisal and development activities, $17.3 million on interest payments to bondholders, $1.6 million on G&A and other cash expenses, $5.9 million in positive cash movements due to changes in working capital items, and $0.7 million used on discontinued operations.


OUTLOOK

The outlook is as follows:

Production Facilities

Work is continuing with foundation work ready to receive the various production modules and equipment during 2015 for the Chiya Khere 30,000 bopd production facility. Onsite delivery is expected to commence from the second quarter with hook-up and commissioning to follow with first oil targeted by end of 2015.

The KRG is to continue installation of the feeder pipeline between the Chiya Khere production facility and the tie-in point on the main export pipeline at KCP2 at kilometre 92. Pipeline commissioning is expected to be completed in time for target production start-up.

Wells

The Operator plans to mobilise a workover rig in April 2015 to conduct well tests on the previously untested CK-5 and CK-8 wells and to complete them for production and connection to the Chiya Khere Phase 1 facilities. In addition 2015 plans are to use the workover rig to complete AT-2 and AT-4, the other two Phase 1 production wells which have been tested, also to be connected to the Chiya Khere Phase 1 facilities as future producers.

ABOUT SHAMARAN

ShaMaran Petroleum Corp. is a Kurdistan focused oil development and exploration company with a 20.1% direct interest in the Atrush oil discovery, which is currently undergoing appraisal and development.

ShaMaran Petroleum is a Canadian oil and gas company listed on the TSX Venture Exchange and the NASDAQ OMX First North Exchange (Stockholm) under the symbol "SNM". Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

ShaMaran’s Certified Advisor on NASDAQ OMX First North is Pareto Securities AB.

The Company's annual consolidated financial statements, notes to the financial statements, management's discussion and analysis and Annual Information Form have been filed on SEDAR ( www.sedar.com ) and are also available on the Company's website ( www.shamaranpetroleum.com ). The Annual Information Form includes the Company's reserves and resource data as at December 31, 2014 as provided by McDaniel & Associates Consultants Ltd and other oil and natural gas information prepared in accordance with National Instrument 51-101 Standards of Disclosure for Oil and Gas Activities.

ShaMaran will hold an annual general meeting of shareholders on June 17, 2015 in Vancouver, British Columbia.

FORWARD LOOKING STATEMENTS

This news  release contains statements and information about expected or anticipated future events and financial results that are forward-looking in nature and, as a result, are subject to certain risks and uncertainties, such as legal and political risk, civil unrest, general economic, market and business conditions, the regulatory process and actions, technical issues, new legislation, competitive and general economic factors and conditions, the uncertainties resulting from potential delays or changes in plans, the occurrence of unexpected events and management’s capacity to execute and implement its future plans. Any statements that are contained in this news release that are not statements of historical fact may be deemed to be forward-looking information. Forward-looking information typically contains statements with words such as  "may", "will", "should", "expect", "intend", "plan", "anticipate", "believe", "estimate", "projects", "potential", "scheduled", "forecast", "budget" or the negative of those terms or similar words suggesting future outcomes. The Company cautions readers regarding the  reliance placed by them on forward‐looking information as by its nature, it is based on current expectations regarding future events that involve a number of assumptions, inherent risks and uncertainties, which could cause actual results to differ materially from those anticipated by the Company.

Actual results may differ materially from those projected by management. Further, any forward-looking information is made only as of a certain date and the Company undertakes no obligation to update any forward-looking information or statements to reflect events or circumstances after the date on which such statement is made or reflect the occurrence of unanticipated events, except as may be required by applicable securities laws. New factors emerge from time to time, and it is not possible for management of the Company to predict all of these factors and to assess in advance the impact of each such factor on the Company’s business or the extent to which any factor, or combination of factors, may cause actual results to differ materially from those contained in any forward-looking information.

         FOR FURTHER INFORMATION PLEASE CONTACT:
         
         Chris Bruijnzeels
         President and CEO
         ShaMaran Petroleum Corp.
         0041 22 560 8605
         chris.bruijnzeels@shamaranpetroleum.com
         
         Sophia Shane
         Corporate Development
         ShaMaran Petroleum Corp.
         (604) 689-7842
         sophias@namdo.com
         www.shamaranpetroleum.com
         
         Robert Eriksson
         Investor Relations, Sweden
         ShaMaran Petroleum Corp.
         0046 701 112615
         reriksson@rive6.ch

Scroll down for more posts ▼

Top 10 Most Recent News Articles

Pennsylvania Housing Finds Its October Holding Pattern

Updated Category News Views 108

Pennsylvania's October housing numbers have the uneasy stillness of a pond before somebody throws a rock. The statewide median sales price sat at $315,000, exactly where it was in September, while sales barely cleared 10,400 and available listings kept inching higher. Nothing in that mix screams boom or bust. Frankly, that is the point: a market can look calm on the...

Continue Reading
Mason Adds Nonprofit Expertise to Institutional Bench

Updated Category News Views 110

Endowment committees rarely need more noise; they need somebody who has actually sat through the uncomfortable votes. Mason Investment Advisory Services has hired Rebecca “Becky” Farnsworth, CFA, as a senior investment consultant, and this looks like a practical addition rather than the usual chest-thumping personnel announcement. Her stated focus will be...

Continue Reading
Lennar's 6.73% Slide Puts Disclosure Claims in Focus

Updated Category News Views 12

A homebuilder can survive ugly margins; murky demand signals are another beast entirely. Lennar is staring at a securities class action after a bruising run of disclosures and market reactions, and the central issue is not whether housing got tougher. Everybody with a pulse knew rates were squeezing buyers. The issue is whether NYSE:LEN gave investors a sufficiently clear...

Continue Reading
AlphaPoint's Approval Device Targets AI Attack Risk

Updated Category News Views 45

A Separate Screen May Be Worth More Than Another Patch AlphaPoint is taking a fairly old security instinct and aiming it at a very current headache: if the laptop is lying to the employee, do not let the laptop have the final say. Its newly introduced Approval Device is dedicated hardware with its own display, built to let authorized staff inspect and approve sensitive...

Continue Reading
Industrial Air Compressors: Fix, Rebuild, or Replace

Updated Category News Views 90

A compressor’s ugliest invoice is rarely the one from the service technician. It is the one nobody sees at first: a stalled production line, missed output, overtime, wasted electricity, and a maintenance crew chasing the same machine again next month. Pam Mahood of Waterloo, Iowa-based Compressed Air & Equipment Co. puts the decision where it belongs—not on the price...

Continue Reading
Hoymiles Brings Plug-In Solar Flexibility to RE+ 2026

Updated Category News Views 105

A 1.8-kilogram box may not sound like much, but it captures where household solar is trying to go: smaller, less intimidating, and far easier to put to work. At RE+ 2026 in Las Vegas, Hoymiles laid out a residential lineup spanning plug-in solar, battery storage and conventional rooftop microinverters. This was not one flashy gadget looking for applause. It was a fairly...

Continue Reading
Triller Lawsuit Puts Merger Disclosures Under a Harsh Light

Updated Category News Views 90

A $0.32 closing price has a way of stripping the paint off a corporate story. The proposed securities class action involving Triller Group, Inc. puts a hard spotlight on a familiar, ugly market sequence: a splashy merger, glowing talk around acquired assets, delayed financial filings, Nasdaq trouble, and then a collapse severe enough to leave shareholders wondering what...

Continue Reading
Sports Leagues Confront Youth Gambling's Hard Truth

Updated Category News Views 70

A stadium-sized advertising machine cannot pretend kids are not watching. That is the uncomfortable backdrop to the National Council on Problem Gambling's November 10 youth gambling prevention summit, where representatives from the NFL, MLB, NBA and PGA Tour met at the NFL's New York offices. Good that they showed up. Frankly, with gambling stitched into so much sports...

Continue Reading
Sidus Gains Argotec Order, but Investors Need the Math

Updated Category News Views 149

A Real Customer Signal, Minus the Revenue Figure An updated image is the least interesting detail in this release. Sidus Space has landed a purchase order from Argotec Group to manufacture cable assemblies for the HAWK satellite platform, with delivery expected in the first quarter of 2027. That is a legitimate operational win for NASDAQ:SIDU. It brings in a new...

Continue Reading
Nevada’s Space Academy Bid Has Assets, Not a Win Yet

Updated Category News Views 29

Desert acreage and a moon-landing backstory make for a handsome pitch, but Nevada is still standing at the starting line. The state has submitted its official response to NASA’s Request for Information for a proposed United States Space Academy, and the new promotional video is meant to show why the Silver State belongs in the conversation. Fair enough. There is real...

Continue Reading

Top 5 Most Recently Viewed Articles

BearingPoint and Swish AI Join Forces to Elevate ITSM Solutions

Updated Category News Views 119

Transforming IT Service Management with AI As digital transformation accelerates, IT service teams encounter challenges like never before. To tackle these issues, management and technology consultancy BearingPoint has formed a significant partnership with Swish AI, a frontrunner in AI-driven IT Service Management (ITSM) solutions. Together, they aim to greatly improve...

Continue Reading
UAB Kvartalas Closes Subscription Early for Latest Bonds

Updated Category News Views 168

UAB Kvartalas Closes Subscription for 4th Tranche of Bonds UAB "Kvartalas", a legal entity committed to facilitating growth and innovation, has made a significant announcement regarding its bond issuance process. The company, registered with the legal code 305475438, has its headquarters situated at Jogailos St. 4, Vilnius, Republic of Lithuania. In response to...

Continue Reading
Transforming 620 Avenue of the Americas: A New Beginning

Updated Category News Views 97

RXR and Hudson Bay Capital Collaborate on a New Vision The partnership between RXR and Hudson Bay Capital marks an exciting chapter for 620 Avenue of the Americas, a renowned 500,000 square-foot property in the heart of the city. This iconic building is often viewed as a significant piece of real estate, known for its high ceilings and spacious floor plates, becoming a...

Continue Reading
Carolyn Mungo Takes Leadership Role at WFAA and KFAA

Updated Category News Views 230

Carolyn Mungo Takes Leadership Role at WFAA and KFAA TEGNA Inc. (NYSE: TGNA) has exciting news as Carolyn Mungo steps into the role of president and general manager at WFAA, the company’s ABC affiliate, along with KFAA, both serving the vibrant Dallas-Fort Worth area. This transition is effective immediately, marking a new chapter in Mungo's impressive career. A Proven...

Continue Reading
GeoPark Initiates Cash Tender Offer for Senior Notes Redemption

Updated Category News Views 157

GeoPark Starts Cash Tender Offer for Senior Notes GeoPark Limited, a prominent player in the oil and gas sector, has announced that it is launching a cash tender offer for all of its outstanding 5.500% Senior Notes due 2027. This strategic move is designed to improve the company’s capital structure and align its financial resources more effectively. The offering...

Continue Reading