They would have installed this prior to laying the floor with the ends capped until the location of sewage and water is determined since at some point if this goes ahead the town will need to install access points for both buildings. Electrical is less an issue than water and sewage lines as there is some service in that area already and all that would remain is for power utilization numbers to be determined to determine what Hydro One will have to do to meet the demands. There is currently a six inch water line servicing this lot running along that property but only septic service in that location. It does show the proper prep work was done before the floor was laid.