Turquoise Hill Provides Update on Oyu Tolgoi Concentrator

New Post Public Reply Private Reply Replies (0) Message Board
News Desk 2018
Turquoise Hill Provides Update on Oyu Tolgoi Concentrator Fire

VANCOUVER, BC--(Marketwired - December 04, 2014) - Turquoise Hill Resources today provided an update on a fire at the Oyu Tolgoi concentrator.

On December 3, 2014, there was a fire in one of the ball mill cyclone packs at the Oyu Tolgoi concentrator. There were no injuries. The concentrator was shutdown to ensure the safety of Oyu Tolgoi's employees and to allow appropriate inspections by relevant authorities. The inspections were completed on December 4 and the operations team is now confirming the extent of the damage and preparing the concentrator for restart. The fire took place in the rubber lined pipes and launders of the cyclone pack. Initial indications are that the fire did not cause significant damage and there was no damage to the ball mill or high voltage electrical systems.

Following the completed inspections, the concentrator will return to service using the other mills and cyclone packs, which is expected to happen on December 5. There are four ball mills and four cyclone packs in the Oyu Tolgoi concentrator.

Any potential production impact will be assessed once the concentrator has restarted.

About Turquoise Hill Resources

Turquoise Hill Resources (NYSE: TRQ) (NASDAQ: TRQ) (TSX: TRQ) is an international mining company focused on copper-gold and coal mines in Mongolia. The Company's primary operation is its 66% interest in the Oyu Tolgoi copper-gold-silver mine in southern Mongolia. Turquoise Hill also holds a 47.9% interest in Mongolian coal miner SouthGobi Resources (TSX: SGQ) (HK: 1878) after giving effect to the private placement announced by SouthGobi on December 1, 2014.

Follow us on Twitter @TurquoiseHillRe

Forward-looking statements Certain statements made herein, including statements relating to matters that are not historical facts and statements of the Company's beliefs, intentions and expectations about developments, results and events which will or may occur in the future, constitute "forward-looking information" within the meaning of applicable Canadian securities legislation and "forward-looking statements" within the meaning of the "safe harbor" provisions of the U.S. Private Securities Litigation Reform Act of 1995. Forward-looking information and statements relate to future events or future performance, reflect current expectations or beliefs regarding future events and are typically identified by words such as "anticipate", "could", "should", "expect", "seek", "may", "intend", "likely", "plan", "estimate", "will", "believe" and similar expressions suggesting future outcomes or statements regarding an outlook. These include, but are not limited to, statements respecting anticipated business activities; planned expenditures; corporate strategies; and other statements that are not historical facts.

Forward-looking statements and information are made based upon certain assumptions and other important factors that, if untrue, could cause the actual results, performance or achievements of the Company to be materially different from future results, performance or achievements expressed or implied by such statements or information. Such statements and information are based on numerous assumptions regarding present and future business strategies and the environment in which the Company will operate in the future, including the price of copper, gold and silver, anticipated capital and operating costs, anticipated future production and cash flows, the ability to complete the disposition of certain of its non-core assets, the ability and timing to complete project financing and/or secure other financing on acceptable terms, and the evolution of discussions with the Government of Mongolia on a range of matters including the implementation of the Investment Agreement, project development costs, operating budgets, the payment of taxes and taxation matters, management fees and governance and the existence or filing of legal proceedings against the Company and its officers and directors. Certain important factors that could cause actual results, performance or achievements to differ materially from those in the forward-looking statements and information include, among others, copper, gold and silver price volatility, discrepancies between actual and estimated production, mineral reserves and resources and metallurgical recoveries, mining operational and development risks, litigation risks, regulatory restrictions (including environmental regulatory restrictions and liability), activities or assessments by governmental authorities, currency fluctuations, the speculative nature of mineral exploration, the global economic climate, dilution, share price volatility, competition, loss of key employees, additional funding requirements, capital and operating costs for the construction and operation of the Oyu Tolgoi mine and defective title to mineral claims or property. Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements and information, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. All such forward-looking information and statements are based on certain assumptions and analyses made by the Company's management in light of their experience and perception of historical trends, current conditions and expected future developments, as well as other factors management believes are appropriate in the circumstances. These statements, however, are subject to a variety of risks and uncertainties and other factors that could cause actual events or results to differ materially from those projected in the forward-looking information or statements.

With respect to specific forward-looking information concerning the construction and development of the Oyu Tolgoi mine, the Company has based its assumptions and analyses on certain factors which are inherently uncertain. Uncertainties and assumptions include, among others: the timing and cost of the construction and expansion of mining and processing facilities; the impact of the decision announced by the Company to delay the funding and development of the Oyu Tolgoi underground mine pending resolution of outstanding matters with the Government of Mongolia associated with the development and operation of the Oyu Tolgoi mine and to satisfy all conditions precedent to the availability of Oyu Tolgoi Project Financing; the approval of the underground feasibility study for the Oyu Tolgoi Project by Oyu Tolgoi's shareholders; the impact of changes in, changes in interpretation to or changes in enforcement of, laws, regulations and government practices in Mongolia; the availability and cost of skilled labour and transportation; the availability and cost of appropriate smelting and refining arrangements; the obtaining of (and the terms and timing of obtaining) necessary environmental and other government approvals, consents and permits; the availability of funding on reasonable terms; the timing and availability of a long-term power source for the Oyu Tolgoi mine; delays, and the costs which would result from delays, in the development of the underground mine (which could significantly exceed the costs projected in the Feasibility Study and in the updated technical report); projected copper, gold and silver prices and demand; and production estimates and the anticipated yearly production of copper, gold and silver at the Oyu Tolgoi mine.

The cost, timing and complexities of mine construction and development are increased by the remote location of a property such as the Oyu Tolgoi mine. It is common in new mining operations and in the development or expansion of existing facilities to experience unexpected problems and delays during development, construction and mine start-up. Additionally, although the Oyu Tolgoi mine has achieved commercial production, there is no assurance that future development activities will result in profitable mining operations. In addition, funding and development of the underground component of the Oyu Tolgoi mine have been delayed until matters with the Government of Mongolian can be resolved and a new timetable agreed. These delays can impact project economics.

This press release contains references to estimates of mineral reserves and mineral resources. The estimation of reserves and resources is inherently uncertain and involves subjective judgments about many relevant factors. The mineral resource estimates contained therein are inclusive of mineral reserves. Further, mineral resources that are not mineral reserves do not have demonstrated economic viability. The accuracy of any such estimates is a function of the quantity and quality of available data, and of the assumptions made and judgments used in engineering and geological interpretation (including future production from the Oyu Tolgoi mine, the anticipated tonnages and grades that will be achieved or the indicated level of recovery that will be realized), which may prove to be unreliable. There can be no assurance that these estimates will be accurate or that such mineral reserves and mineral resources can be mined or processed profitably. See the discussion under the headings "Language Regarding Reserves and Resources" and "Note to United States Investors Concerning Estimates of Measured, Indicated and Inferred Resources" in the Company's MD&A filed on SEDAR and EDGAR.

Readers are cautioned not to place undue reliance on forward-looking information or statements. By their nature, forward-looking statements involve numerous assumptions, inherent risks and uncertainties, both general and specific, which contribute to the possibility that the predicted outcomes will not occur. Events or circumstances could cause the Company's actual results to differ materially from those estimated or projected and expressed in, or implied by, these forward-looking statements. Important factors that could cause actual results to differ from these forward-looking statements are included in the "Risk Factors" section in the Company's Annual Information Form dated as of March 26, 2014 in respect of the year ended December 31, 2013 (the "AIF").

Readers are further cautioned that the list of factors enumerated in the "Risk Factors" section of the AIF that may affect future results is not exhaustive. When relying on the Company's forward-looking information and statements to make decisions with respect to the Company, investors and others should carefully consider the foregoing factors and other uncertainties and potential events. Furthermore, the forward-looking information and statements herein are made as of the date hereof and Turquoise Hill does not undertake any obligation to update or to revise any of the included forward-looking information or statements, whether as a result of new information, future events or otherwise, except as required by applicable law. The forward-looking information and statements contained herein are expressly qualified by the cautionary statement.

Contacts    Investors      Jessica Largent Office: +1 604 648 3957 Email: jessica.largent@turquoisehill.com    Media Tony Shaffer Office: +1 604 648 3934 Email: tony.shaffer@turquoisehill.com

Scroll down for more posts ▼

Top 10 Most Recent News Articles

iGarden Bets AI Can Turn Pools Into Backyard Parks

Updated Category News Views 92

A swim jet drawing a YouTuber to a Lyon trade show is not the usual signal investors get from pool equipment, and that is precisely why iGarden’s presentation at Piscine Global 2026 caught my eye. The Fairland Group brand is selling more than a cleaner or a pump attachment. It is pitching an “AI Garden” where the pool, garden maintenance, energy management and...

Continue Reading
Trench Group Puts Grid Hardware in a Public Spotlight

Updated Category News Views 120

Electricity gets applause only when it fails, which is a rotten way to appreciate the machinery doing the heavy lifting. Trench Group’s upcoming appearance on All Access with Andy Garcia is aimed at that invisible middle layer of the power system: the high-voltage components that help move, measure and steady electricity before it reaches a house, a hospital, a factory...

Continue Reading
KuCoin Tests Its Australian Promise Beyond the Party

Updated Category News Views 10

A golf ambassador, a harbour party, and AI-money warnings make for an odd regulatory cocktail. Yet that is the package KuCoin is bringing to Australia as it opens an in-person programme built around a phrase the crypto business badly needs to prove: global infrastructure and local accountability. The opening event took place in Sydney on 23 November, with Australian...

Continue Reading
eMazzanti Finalist Nod Tests Its Staying Power in NJ

Updated Category News Views 23

Twenty-five years in managed technology is a longer haul than most people appreciate. eMazzanti Technologies, founded in Hoboken in 2001, has landed among three finalists for NJBIZ's 2026 For-profit Business of the Year award in the 50–99 employee category. That is not a revenue filing, a margin report, or a contract backlog disclosure. It is, however, a decent outside...

Continue Reading
Seasonal HVAC Care Is a Quiet Bet on System Reliability

Updated Category News Views 140

A furnace quitting during a Wisconsin cold snap is not usually bad luck; it is often a small, ignored problem finally collecting its debt. That is the practical point behind Brian Sinkler's guidance in a HelloNation feature: heating and cooling equipment tends to telegraph trouble long before it stops working. People just do not notice the signals until a deep freeze or...

Continue Reading
Nora Fleming Bets Small Business Saturday on Stores

Updated Category News Views 7

A retailer voluntarily blacking out its own checkout during Thanksgiving weekend sounds like lunacy until you look at the channel it is protecting. On November 28, 2026, nora fleming plans to shut down its website’s selling function for Small Business Saturday and send visitors toward more than 2,100 independent retailers across the U.S. In an age when every consumer...

Continue Reading
Dell's $132 Billion Backlog Meets a Choppy AI Tape

Updated Category News Views 51

One minute the market was throwing confetti; the next it was checking the exits. That is the mood around AI stocks after a 6.5% Nasdaq surge on Monday gave way to a 1.48% pullback Tuesday. Big demand numbers did not vanish overnight. Prices simply reminded everybody that even a roaring theme can get awfully crowded when traders smell a quick win. Dell Supplies the Hardest...

Continue Reading
Noma Brings Local AI Agent Security to APAC Markets

Updated Category News Views 187

Data location has become the unglamorous bouncer standing between enterprise AI pilots and real deployment. Noma's decision to offer cloud hosting in Australia and Singapore is therefore more meaningful than another map pin in a software company's announcement deck. It gives Asia-Pacific organizations a way to keep a Noma tenant, its AI agent security data, and its...

Continue Reading
Phoenix Finds Its Fee Engine While Returning Cash Fast

Updated Category News Views 18

Fees Are Doing the Heavy Lifting Phoenix has put up the kind of nine-month report that makes an investor stop grumbling for a minute and inspect the machinery. Core income reached NIS 2.147 billion through September 2026, up 8% from NIS 1.985 billion a year earlier. That is respectable on its own. The more important bit is where the momentum came from: asset-management...

Continue Reading
Gourmia’s $39.99 Air Fryer Tests Black Friday Demand

Updated Category News Views 86

A crowded holiday oven is the sort of minor household misery that sells countertop gadgets, and Gourmia is leaning into it hard. Its 6-Quart Digital Air Fryer, model GAF616, is marked down to $39.99 at Target from a stated regular price of $69.99 through Nov. 29. That is roughly a 43% cut, not pocket change in a product aisle where shoppers can compare boxes, features,...

Continue Reading

Top 5 Most Recently Viewed Articles

Discover ANB033: AnaptysBio's Innovative CD122 Antagonist

Updated Category News Views 359

AnaptysBio's Upcoming Virtual Investor Event In an exciting announcement from the world of biotechnology, AnaptysBio, Inc. (Nasdaq: ANAB), based in San Diego, is gearing up for a key virtual investor event to showcase its groundbreaking work on ANB033. This CD122 antagonist aims to address various health conditions, particularly focusing on celiac disease. What to Expect...

Continue Reading
Novartis Completes Strategic Acquisition to Enhance Innovation

Updated Category News Views 249

Novartis Finalizes Acquisition of Tourmaline Bio Novartis has successfully completed its acquisition of Tourmaline Bio, Inc., marking a significant milestone in its commitment to advance cardiovascular innovation. With this acquisition, shares of Tourmaline have ceased trading on the Nasdaq Stock Market and the company now operates as an indirect wholly owned subsidiary...

Continue Reading
Nutriband's Insights on Growth and Innovation in 2025

Updated Category News Views 224

Nutriband's Journey Towards Innovative Drug Solutions Nutriband Inc. (NASDAQ:NTRB)(NASDAQ:NTRBW) is proud to share insights into their achievements as they strive for innovation in the pharmaceutical industry. CEO Gareth Sheridan recently communicated with shareholders, reflecting on the significant advances made through 2024, as well as potential developments for the...

Continue Reading
Construction Begins for Grand Hyatt Miami Beach with $392M Fund

Updated Category News Views 334

Grand Hyatt Miami Beach Construction Financing Secured Exciting developments are underway as Terra and Turnberry, two prominent real estate development firms, are set to transform the hospitality landscape with their new Grand Hyatt Miami Beach project. This 800-room luxury hotel will stand as a key feature in the Convention Center District, promising to elevate the...

Continue Reading
S&P 500 Bull Microchannel Sets Stage for New Market Heights

Updated Category News Views 234

S&P 500 E-mini Bull Microchannel Overview Currently, the S&P 500 E-mini is demonstrating a robust bull microchannel, with a significant breaking point above the 6900 level. With this formation, market bulls are setting their sights on new targets at the 7000 and 7100 levels. However, if a pullback occurs, many expect at least a minor second leg of sideways movement or an...

Continue Reading