I believe they stopped loading Ilia May 2013 at 68069 tons CWRN ore because of draft of 13.7 m w 68069 tons- always need leeway as required by insurance
similarly took some ore off loreto aug 2011- ca 36002 tons shipped due to draft limits of chinese river -manifests always vary