Investors Hangout Stock Message Boards Logo
  • Mailbox
  • Favorites
  • Boards
    • The Hangout
    • NASDAQ
    • NYSE
    • OTC Markets
    • All Boards
  • Whats Hot!
    • Recent Activity
    • Most Viewed Boards
    • Most Viewed Posts
    • Most Posted
    • Most Followed
    • Top Boards
    • Newest Boards
    • Newest Members
  • Blog
    • Recent Blog Posts
    • Recently Updated
    • News
    • Stocks
    • Crypto
    • Investing
    • Business
    • Markets
    • Economy
    • Real Estate
    • Personal Finance
  • Market Movers
  • Interactive Charts
  • Login - Join Now FREE!
  1. Home ›
  2. Stock Message Boards ›
  3. Stock Boards ›
  4. Plastic2Oil, Inc. (PTOI) Message Board

Enforcement Actions Search Results ... AGILYX COR

Message Board Public Reply | Private Reply | Keep | Replies (0)                   Post New Msg
Edit Msg () | Previous | Next


Post# of 43066
Posted On: 11/04/2014 7:05:39 PM
Avatar
Posted By: 4kids
Re: stocker11 #15702
Enforcement Actions Search Results ... AGILYX CORPORATION

Data is current as of: 11/4/2014 at 4:02:16 PM PST.

The following 17 records match your search criteria. They are sorted alphabetically by legal name and inspector name and are presented in two tables (The first table displays 17 enforcement action records after 1997. The second table displays 0 enforcement action records prior to 1997).

TIP -- Change page orientation to landscape before printing this report.

Search Again
Enforcement Actions Initiated by Inspector and Issued to Source, 1998 to present
Enforcement Number Program/Region Source Name and Location Inspector Enforcement
Staff Enforcement Type Violations Issued Penalty
Paid
2014-113 Land Quality, Hazardous Waste

Northwest Region AGILYX CORPORATION @ TIGARD COLLINS SIEGEL/BACHMAN Notice of Civil Penalty Assessment Accumulating hazardous waste more than 30 days beyond the specified accumulation time frame 10/21/2014
2014-113 Land Quality, Hazardous Waste

Northwest Region AGILYX CORPORATION @ TIGARD COLLINS SIEGEL/BACHMAN Notice of Civil Penalty Assessment Failing to comply with the preparedness, prevention, contingency plan or emergency procedure requirements, unless otherwise classified 10/21/2014
2014-113 Land Quality, Hazardous Waste

Northwest Region AGILYX CORPORATION @ TIGARD COLLINS SIEGEL/BACHMAN Notice of Civil Penalty Assessment Failing to keep containers of hazardous waste closed, except when adding or removing wastes 10/21/2014
2014-113 Land Quality, Hazardous Waste

Northwest Region AGILYX CORPORATION @ TIGARD COLLINS SIEGEL/BACHMAN Notice of Civil Penalty Assessment Failing to label a tank having a capacity of 100 gallons or more, or containers equaling more than 110 gallon capacity used for the accumulation or storage of hazardous waste 10/21/2014
2014-113 Land Quality, Hazardous Waste

Northwest Region AGILYX CORPORATION @ TIGARD COLLINS SIEGEL/BACHMAN Notice of Civil Penalty Assessment Failing to label containers equaling 110 gallon capacity or less used for the accumulation or storage of hazardous waste 10/21/2014
2014-113 Land Quality, Hazardous Waste

Northwest Region AGILYX CORPORATION @ TIGARD COLLINS SIEGEL/BACHMAN Notice of Civil Penalty Assessment Failing to place an accumulation start date on a container used for accumulation or storage of hazardous waste 10/21/2014
2014-113 Land Quality, Hazardous Waste

Northwest Region AGILYX CORPORATION @ TIGARD COLLINS SIEGEL/BACHMAN Notice of Civil Penalty Assessment Generating, treating, storing, or disposing of hazardous waste without complying with the Personnel Training requirements 10/21/2014
2012-012 Land Quality, Hazardous Waste

Northwest Region AGILYX CORPORATION @ TIGARD COOK WHEELER Mutual Agreement and Order with an upfront Civil Penalty Accepting, transporting or offering for transport hazardous waste without a uniform hazardous waste manifest 5/14/2013 $6,359
2012-012 Land Quality, Hazardous Waste

Northwest Region AGILYX CORPORATION @ TIGARD COOK WHEELER Mutual Agreement and Order with an upfront Civil Penalty Accumulating hazardous waste more than 30 days beyond the specified accumulation time frame 5/14/2013 $6,359
2012-012 Land Quality, Hazardous Waste

Northwest Region AGILYX CORPORATION @ TIGARD COOK WHEELER Mutual Agreement and Order with an upfront Civil Penalty Failing to comply with 40 CFR 264 or 265 Subparts J, W or DD standards, other than unit design or unit integrity assessment 5/14/2013 $6,359
2012-012 Land Quality, Hazardous Waste

Northwest Region AGILYX CORPORATION @ TIGARD COOK WHEELER Mutual Agreement and Order with an upfront Civil Penalty Failing to comply with the preparedness, prevention, contingency plan or emergency procedure requirements, unless otherwise classified 5/14/2013 $6,359
2012-012 Land Quality, Hazardous Waste

Northwest Region AGILYX CORPORATION @ TIGARD COOK WHEELER Mutual Agreement and Order with an upfront Civil Penalty Failing to label a tank having a capacity of 100 gallons or more, or containers equaling more than 110 gallon capacity used for the accumulation or storage of hazardous waste 5/14/2013 $6,359
2012-012 Land Quality, Hazardous Waste

Northwest Region AGILYX CORPORATION @ TIGARD COOK WHEELER Mutual Agreement and Order with an upfront Civil Penalty Failing to make a complete and accurate hazardous waste determination on a residue as required by OAR 340-102-0011 5/14/2013 $6,359
2012-012 Land Quality, Hazardous Waste

Northwest Region AGILYX CORPORATION @ TIGARD COOK WHEELER Mutual Agreement and Order with an upfront Civil Penalty Failing to prepare a contingency plan 5/14/2013 $6,359
2012-012 Land Quality, Hazardous Waste

Northwest Region AGILYX CORPORATION @ TIGARD COOK WHEELER Mutual Agreement and Order with an upfront Civil Penalty Failing to timely submit an annual report, by a hazardous waste generator, TSD facility, or hazardous waste recycling facility. 5/14/2013 $6,359
2012-012 Land Quality, Hazardous Waste

Northwest Region AGILYX CORPORATION @ TIGARD COOK WHEELER Mutual Agreement and Order with an upfront Civil Penalty Generating, treating, storing, or disposing of hazardous waste without complying with the Personnel Training requirements 5/14/2013 $6,359
2012-012 Land Quality, Hazardous Waste

Northwest Region AGILYX CORPORATION @ TIGARD COOK WHEELER Mutual Agreement and Order with an upfront Civil Penalty Operating a hazardous waste treatment, storage or disposal facility (TSD) without first obtaining a permit or without having interim status 5/14/2013 $6,359

Total Records: 17

http://www.deq.state.or.us/programs/enforcement/EnfQuery.asp


(0)
(0)




Plastic2Oil, Inc. (PTOI) Stock Research Links


  1.  
  2.  


  3.  
  4.  
  5.  






Investors Hangout

Home

Mailbox

Message Boards

Favorites

Whats Hot

Blog

Settings

Privacy Policy

Terms and Conditions

Disclaimer

Contact Us

Whats Hot

Recent Activity

Most Viewed Boards

Most Viewed Posts

Most Posted Boards

Most Followed

Top Boards

Newest Boards

Newest Members

Investors Hangout Message Boards

Welcome To Investors Hangout

Stock Message Boards

American Stock Exchange (AMEX)

NASDAQ Stock Exchange (NASDAQ)

New York Stock Exchange (NYSE)

Penny Stocks - (OTC)

User Boards

The Hangout

Private

Global Markets

Australian Securities Exchange (ASX)

Euronext Amsterdam (AMS)

Euronext Brussels (BRU)

Euronext Lisbon (LIS)

Euronext Paris (PAR)

Foreign Exchange (FOREX)

Hong Kong Stock Exchange (HKEX)

London Stock Exchange (LSE)

Milan Stock Exchange (MLSE)

New Zealand Exchange (NZX)

Singapore Stock Exchange (SGX)

Toronto Stock Exchange (TSX)

Contact Investors Hangout

Email Us

Follow Investors Hangout

Twitter

YouTube

Facebook

Market Data powered by QuoteMedia. Copyright © 2025. Data delayed 15 minutes unless otherwise indicated (view delay times for all exchanges).
Analyst Ratings & Earnings by Zacks. RT=Real-Time, EOD=End of Day, PD=Previous Day. Terms of Use.

© 2025 Copyright Investors Hangout, LLC All Rights Reserved.

Privacy Policy |Do Not Sell My Information | Terms & Conditions | Disclaimer | Help | Contact Us