Actually, article I. Inspector's Conclusion stated
Post# of 56323
Quote:
the applicant will be ready and able to meet the requirements of the MMPR provided the deficiencies noted furring the inspection debrief meeting are addressed. A re-inspection may be required to assess the security measures for the full scale growing pods once construction is complete.
The only other deficiency I saw was regarding the 2 vents in the vault needed to be covered with a steel mesh but the conclusions clearly stated the only reason a re-instaction MIGHT be needed was to check the growing pods.
FITX