This is the Baja 14 concession being mined-N Baj
Post# of 8054
This is the Baja 14 concession being mined-N Baja 14 is on the left-the "map point" w the arrow is where they mined on the Coloso for the 2nd ship Loreto(36002 ton dmt load)-before they reportedly acquired the previous 68 drill holes May 2011(which is when Bob sent me the drilling maps to be posted)until then they were not focused on veins and most activity was to the right and above the arrow point-w one of the flat cleared areas(upper 1 i think-different maps have different orientations-as laydown) The large expansion along the strike of the Coloso has been to the left of the map "arrow point"
where I believe they added land to the concessjion to follow the Coloso strike further-see Sept PR?
S Baja is south across the San Vicente River-(seen between the 2 halves of the concession w S Baja 14 extending partially into the river which is dry during most of the summer and fall
The secondary paved highway borders CWRN's N Baja 14 on the right of Baja 14 N as seen and is only ca 5.5 miles to Highway 1-Baja's N-S freeway lifeline which goes directly to the port.