R18-9-105. Permit Continuance A. Continuance.
Post# of 12259
A. Continuance.
1. Groundwater Quality Protection Permits.
a. Subject to R18-9-104 and other provisions of this Section, a Groundwater Quality Protection Permit issued before September 27, 1989 is valid according to the terms of the permit until replaced by an Aquifer Protection Permit issued by the Department.
b. A person who owns or operates a facility to which a Groundwater Quality Protection Permit was issued is in compliance with Articles 1, 2, and 3 of this Chapter and A.R.S. Title 49, Chapter 2, Article 3, if the facility:
i. Meets the conditions of the Groundwater Quality Protection Permit; and
ii. Is not causing or contributing to the violation of any Aquifer Water Quality Standard at a point of compliance, determined by the criteria in A.R.S. § 49-244.