Geomega Res Inc (GOMRF) 0.2410 $GOMRF
Geomega Resources Inc.: Annual Meeting Corporate Update
Marketwire - Wed Sep 10, 10:08AM CDT
Geomega Resources Inc. (TSX VENTURE: GMA)
Geomega Resources Inc.: 250 Meters Gold-Bearing Corridor on Anik
Marketwire - Thu Sep 04, 7:14PM CDT
Futher to the news release of August 29, 2014, Geomega Resources Inc. ("GeoMegA" or the "Company"

(TSX VENTURE: GMA), is pleased to announce the discovery of new gold-bearing outcrops revealing a 250 meters mineralized corridor on its Anik property located 40 km south of Chapais, in Quebec. Three (3) mineralized outcrops, more then 250 meters apart, confirm the extensions and gold potential of the corridor. A saw sample taken on the new, mechanically stripped outcrop graded 3.16 g/t Au. In addition, two (2) new angular to sub-angular blocks, located 50 meters S-W of the discovery outcrop, graded 2.63 and 2.84 g/t Au. The gold-bearing corridor is located within an important structural zone of the Guercheville/Opawica deformation corridor.
Geomega Resources Inc.: Gold Discovery on Anik
Marketwire - Fri Aug 29, 3:53PM CDT
Geomega Resources Inc. ("GeoMegA" or the "Company"

(TSX VENTURE: GMA), is pleased to announce a gold discovery on its Anik property located 40 km south of Chapais, in Quebec. The 2014 geological reconnaissance campaign resulted in the discovery of several economic gold grades from a 4 m3 toppled block (sub-in-place) and blocks extracted mechanically from the underlying outcrop. The extensions of this outcrop, surrounded by overburden, are open. The discovery area is located within an important structural zone of the Guercheville/Opawica deformation corridor.
Geomega Resources Inc.: First Tranche Closing of $3,315,000 Brokered Private Placement
Marketwire - Wed Mar 19, 1:34PM CDT
Further to its news release of February 28, 2014, Geomega Resources Inc. ("GeoMegA" or the "Company"

(TSX VENTURE: GMA) announces a first tranche closing (the "First Tranche"

of a brokered private placement with Industrial Alliance Securities Inc. ("IAS"

consisting of 2,037,333 units (the "Units"

at a subscription price of $0.60 per Unit and 1,450,000 flow-through shares (each, a "Flow-Through Share"

, at a price of $0.70 per Flow-Through Share for gross proceeds of $2,237,400 (the "Private Placement"

.
InvestorIntel: GeoMegA's Rare Earth Separation Process and Resource Update Catalyst for Shareholder Revelry
Newsfile Corp - Mon Mar 03, 8:00AM CST
full story)
Geomega Resources Inc.: $ 3,015,000 Brokered Private Placement
Marketwire - Fri Feb 28, 9:27AM CST
Geomega Resources Inc. ("GeoMegA" or the "Company"

(TSX VENTURE: GMA) announces it has entered into an engagement letter with Industrial Alliance Securities Inc. ("IAS"

for a private placement consisting of 3,333,333 units (the "Units"

at a subscription price of $0.60 per Unit and 1,450,000 flow-through shares (each, a "Flow-Through Share"

, at a price of $0.70 per Flow-Through Share for gross proceeds of $3,015,000 (the "Private Placement"

.
IIROC Trade Resumption - Geomega Resources Inc.
Newsfile Corp - Tue Feb 25, 6:59AM CST
Trading resumes in:
GeoMegA Resources Inc.: Physical Separation of REE-Neighbour series
Marketwire - Mon Feb 24, 9:34PM CST
Geomega Resources Inc. ("GeoMegA" or the "Company"

(TSX VENTURE: GMA)
GeoMegA Resources Inc.: Heavy Rare Earth Zone Defined Over 350 m by 20 m by 230 m and Still Open at Depth
Marketwire - Wed Jan 29, 7:30AM CST
Highlights of the news release:
GeoMegA Drills 830 ppm Dysprosium Oxide at Montviel
Marketwire - Tue Jan 21, 5:31AM CST
Geomega Resources Inc. (TSX VENTURE: GMA) -
Geomega Resources Inc.: Breakthrough in Physical Separation of REE
Marketwire - Wed Jan 15, 5:31AM CST
Geomega Resources Inc. ("GeoMegA" or the "Company"

(TSX VENTURE: GMA), in cooperation with FFE Service GmbH (Munich, Germany), is pleased to announce the successful conclusion of tests confirming physical separation of rare earth elements ("REE"

. Based on free flow electrophoresis(1) technology, GeoMegA's physical separation process has the potential to dramatically reduce the capital required to build separation facilities compared to conventional techniques (i.e. fractional precipitation, ion exchange and solvent extraction), optimize REE recovery and improve the environmental performance of operations.