CWRN's ore is stored near pushpin 1, shiploading c
Post# of 8054
CWRN's ore is stored near pushpin 1, shiploading cranes are near pushpin 2-havent used port conveyors because a jumper conveyor from ore to hopper would block access to the south end of the dock-but as grakekk has pointed out may be able to load opposite CWRN's ore -port dredged to 47 feet- at least 7 feet deeper than a Panamax draft since Panamax's have been limited to 39.5 feet til now- and I saw a pic of one of the dredgers dredging opposite the ore end of dock jan 2011.