If I remember, once the McComas 20 is in operation
Post# of 39368
If I remember, once the McComas 20 is in operation, this free's up $ 2.1 M. And I think the Sabine wells with TNC ( correct me if I'm wrong ) drilling. Has that been finalized and are the re-works getting ready to start? Until we hear differently, those wells should bring Teco about 240 per day.