$TAMG During the project's proposed second phase, Transnational Group plans to have purchased the necessary equipment to separate the titanium and iron ore tailings from the raw materials on the property. As a result, on the Anaconda claim, Lanix would expect to double production from 1,000 tons of raw material daily to 1,000 tons each of titanium and iron ore. This increase in production would more than double Lanix's operating income projections for the mine.
(0)
(0)