https://fbcdn-sphotos-h-a.akamaihd.net/hphotos-ak-
Post# of 8054
I will attribute if wanted but in past this source (nobody assoc w the co) has wished to remain anon re such a pic source
this is a june 20 pic of the API cabotage (foreground where the ship w big pipes is- APi2 would only be used by very small ships )
the EIT1 office berth where ore or scrap metal (cant tell at a distance) is to right of the large blue crane
and EIT2 14.5M gantry crane berth CWRN has used to date
lot more room at API 1 for ore but 200m length and 13.05m draft limitations (they stopped loading ILIA at 13.7 m w only ca 69000 tons on a ship that could carry possibly 75000 or more tons (but only ca 52500 tons thru canal due to Gatun lake draft limitations)