All, Good discussion with Reid today. Delays wi
Post# of 39368
All,
Good discussion with Reid today. Delays with directional bit in Madeley, will continue drill out to 1700': McCoumus producing, Lakeshore producing; JV with drilling company to bring 50 reworks online ASAP; Belize perf on SJ2 indicating problem in cement casing up line, in process of rectifying. SJ1 to be perforated behind SJ2 completion.
300+bpd by month end, with tremendous upside potential.
Thanks coolnapz for the daily shakedown of the tape...Helps a novice as myself see a lot clearer through the smoke and mirrors.
IMO..Very, Very good times ahead...as I have said before...Get Ready to
laissez bon temps rouler!!!
Geaux TECO Geaux
JKS
2.3m