Look at the ground away from the log. But that doesn't matter. It is wishful thinking saying they have pulled any logs, much less pulling since the beginning of April. They went down there to Celebrate the first log coming out. That was mentioned here earlier. But even more than that, they have no reason to transport a log. The extra costs of dealing with something that bulky will prevent that. They will cut them to a manageable size then transport them in a container. But even that not it. It will take more than a couple of months, at least, to get the wood to NorthCal. The scheduling one those container ships takes months to develop, until one is using the entire ship. Even then it can take quite a while.
I am not wanting to rain (No pun intended) on anyones parade, but think about the stuff being posted here. it is getting more elaborate an farfetched as time goes on. I have posted how things have changed with me and I need for himr to move. But thinking they are already shipped to NorthCal is way to far a stretch.
The only explanation is something has caused them to stop or be stopped dead in the water. Nothing else makes sense. until they tell us what that is, we are stuck.
tex
(0)
(0)
Hollund Industrial Marine Inc. (HIMR) Stock Research Links