VANCOUVER, BRITISH COLUMBIA--(Marketwired - Apr 29, 2014) - Klondex Mines Ltd. (TSX:KDX)(OTCQX:KLNDF) ("Klondex" or the "Company") is pleased to announce the results of an independent Preliminary Economic Assessment ("PEA") for its wholly-owned Fire Creek Exploration Project ("Fire Creek" or the "Project") near Elko, Nevada. The PEA was prepared by Practical Mining, LLC ("PM"). All figures are quoted in US dollars. The technical report associated with the PEA will be filed on SEDAR within 45 days.

Fire Creek Project Estimates Highlights at $1250/oz Gold:
All-in sustaining (including Ag by-product) $636/oz
Cash costs (including Ag by-product) $459/oz
LOM estimate 5 yrs
Average LOM gold grade 0.68 opt Au; 23.3 g/t Au
Average LOM silver grade 0.34 opt Ag; 11.7 g/t Ag
Total production 280k ozs Au; 139k oz Ag
Capital costs $49.6 mm
Pay-back period 0.5 yrs
After-tax cash flow $157.3 mm
After-tax 5% NPV $141.5 mm
Profitability Index (see definition: http://www.klondexmines.com/s/definitions.asp ) 4.1
Note: The IRR could not be calculated because the cash flow is positive in the first year and every succeeding year of the project.

Paul Huet, Klondex President and CEO, stated, "The Fire Creek PEA represents a significant and encouraging milestone for Klondex. The PEA details an initial mine plan with immediate positive cash flows that have the potential to remain economic in low gold price environments. We believe Fire Creek is a unique project, and what sets it apart are the gold grades, short path to production, and the substantial exploration upside. The PEA establishes that our mining operation has the potential to be the cornerstone for our growth for many years."

He continued, "Drilling in the past few years has been constrained to surface and infill drilling for definition, within 7% of our land package. This year, we have allocated $9mm for waste development and new drilling platforms to test new extensions of our current veins and the potential for new discoveries, particularly to the West and North Zones."

Assuming an average gold and silver price of $1,250 and $18 per ounce, respectively, Fire Creek has an estimated $157.3 mm after-tax cash flow, a $141.5mm after-tax net present value ("NPV") at a 5% discount rate and a $128.3 mm after-tax NPV at a 10% discount rate. The PEA cash flow is presented at the project level and does not include obligations for servicing corporate debt.

The PEA is preliminary in nature and includes inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves. There is no certainty that the preliminary economic assessment will be realized. Mineral resources that are not mineral reserves do not have demonstrated economic viability.

Mineral Resources

The PEA is based on a mineral resource estimate with an effective date of December 31, 2013. The Fire Creek database used for the mineral resource estimate includes 408 drill holes totaling over 133,000 m (437,000 ft) and 1,120 channel and face samples and is reflective of underground development work at Fire Creek during 2013 resulting in the processing of 8,007 tons of mineralized material.

The PEA provides a basis to estimate project operating and capital costs and establish a projection of the potential mineable mineral resources including measured, indicated and inferred categories in accordance with National Instrument 43-101. The mineral resource estimate which forms the basis of the PEA is as follows, at a 0.225 opt Au cut-off grade:

Measured Indicated
Cut-off Grade (opt) Tons (000's) Gold (opt) Silver (opt) Cont. Gold (000's oz) Cont. Silver (000's oz) Tons (000's) Gold (opt) Silver (opt) Cont. Gold (000's oz) Cont. Silver (000's oz)
0.15 22 1.67 1.08 37 24 308 0.85 0.64 263 197
0.20 22 1.68 1.09 37 24 248 1.02 0.73 253 180
0.225 22 1.68 1.09 37 24 213 1.16 0.80 246 171
0.25 22 1.68 1.09 37 24 200 1.22 0.83 244 166
0.30 22 1.69 1.10 37 24 175 1.36 0.88 237 154
Measured and Indicated Inferred
Cut-off Grade (opt) Tons (000's) Gold (opt) Silver (opt) Cont. Gold (000's oz) Cont. Silver (000's oz) Tons (000's) Gold (opt) Silver (opt) Cont. Gold (000's oz) Cont. Silver (000's oz)
0.15 331 0.91 0.67 300 221 904 0.52 0.37 470 334
0.20 270 1.08 0.76 290 204 705 0.62 0.42 439 299
0.225 235 1.21 0.83 284 195 627 0.68 0.45 424 281
0.25 222 1.26 0.85 281 190 576 0.72 0.47 413 269
0.30 197 1.40 0.91 275 178 473 0.82 0.50 387 236
  1. Notes: Mineral resources, which are not mineral reserves, do not have demonstrated economic viability. The estimate of mineral resources may be materially affected by environmental, permitting, legal, title, socio-political, marketing, or other relevant issues.
  2. The quantity and grade of reported inferred mineral resources in this estimation are uncertain in nature and there is insufficient exploration to define these inferred mineral resources as an indicated or measured mineral resource. It is uncertain if further exploration will result in upgrading such inferred mineral resources to an indicated or measured mineral resource category.
  3. Mineral resources have been estimated at a cut-off grade of 0.225 opt (7.7 g/t) calculated with a $1,250 per ounce gold price, $18 per ounce silver price 94% gold recovery and 92% silver recovery mineral resources include allowances of 5% mining losses and 10% dilution.

Mine Planning

The Fire Creek mine plan assumes that a total of 439,000 tons of material containing 297,300 ounces of gold and 150,800 ounces of silver will be mined over the five year period. Key projected production statistics are summarized below.

Fire Creek Mine Plan (contained ounces)
Mineral Resource Category 2014 2015 2016 2017 2018 Total
Measured kt 9.2 7.0 1.6 4.5 9.6 32.0
Au koz 11.8 5.1 1.9 8.5 13.0 40.4
Ag koz 8.2 3.1 1.0 5.6 9.0 26.9
Indicated Kt 34.3 65.5 62.3 32.8 16.2 211.1
Au koz 24.1 45.5 45.5 20.8 9.0 144.9
Ag koz 15.0 27.6 25.2 9.7 5.5 83.0
Total M & I Kt 43.5 72.5 63.9 37.3 25.8 243.1
Au koz 35.9 50.6 47.4 29.4 22.0 185.3
Ag koz 23.2 30.7 26.1 15.4 14.6 109.9
Inferred Kt 16.8 20.6 64.7 89.5 4.3 195.9
Au koz 9.4 14.1 32.3 50.6 5.6 112.0
Ag koz 6.0 9.3 9.1 13.6 2.9 40.9

The Fire Creek PEA mine plan only includes mineral resources within the veins which can be readily accessed from the existing development platform. The majority of mineral resources in the North Zone and all of the mineral resources in the Far North Zone were not considered in the current mine plan due to the mine development requirements for these zones. As additional exploration information is gained, the mine plan may be extended to the north to include these mineral resources.

Additionally, some of the mineral resources near the current development platform are contained in veins of insufficient width to meet cut-off grades when minimum mining widths are applied. Alternative mining methods which reduce dilution and/or development requirements should be investigated for the extraction of these mineral resources.

Underground Mining

The proposed mining methods for Fire Creek will be any one or more of the following: end slice stoping with delayed backfill, also referred to as long hole stoping; cut and fill stoping; and shrinkage stoping. The final choice of mining method will depend upon the geometry of the stope block, proximity to main access ramps, ventilation and escape routes, the relative strength or weakness of the mineral resources and adjacent wall rock, and finally the value or grade of the mineral resources. The choice of mining method for individual stoping areas will not be made until stope delineation and definition drilling is completed.

Metallurgy & Processing

Mined material from Fire Creek will be shipped to Klondex's Midas Mill for processing. The Fire Creek material will be blended with the Midas material prior to milling.

The Midas Mill was constructed in 1997 and has a nameplate capacity of 1,200 short tons per day. The mill uses conventional leach technology with counter current decantation followed by Merrill Crowe precipitation. Doré is further refined at Johnson Matthey refineries in Utah. Process toll milling has been performed periodically since 2008. Historically, the gold recovery has ranged from 92% to 97%, and silver recovery from 87% to 93%, depending upon processing rates and ore types. Mill availability for the life of the project is estimated at 95%.

Klondex began operating the Midas Mill on February 19, 2014 and immediately began processing a blend of the Fire Creek and Midas mineralized material at a rate averaging 25 tons per hour. At the end of the first quarter of 2014, over 7,800 tons of Fire Creek mineralized material was processed with gold and silver recoveries calculated at 96% and 95%, respectively. Currently, the mill is being operated at 50% of its capacity.

Capital Costs

Projected Life of Mine (LOM) constant dollar capital expenditures are detailed in the table below. Mine development comprises over 57% of total capital requirements, resource conversion drilling 23% and mining equipment 11%.

Fire Creek Capital Costs (mm's)
Category 2014 2015 2016 2017 2018 Total
Waste Development 6.7 6.8 9.4 5.5 0.0 28.4
RIB Construction 0.7 0.0 0.0 0.0 0.0 0.7
Site Facilities 1.6 1.1 0.0 0.0 0.0 2.7
Environmental Assessment 0.9 0.0 0.0 0.0 0.0 0.9
Mining Equipment 0.4 2.2 2.0 0.9 0.0 5.5
Drilling 2.3 3.0 3.0 3.0 0.0 11.3
Total 12.7 13.1 14.4 9.4 0.0 49.6

Operating Costs

Projected operating costs are based on actual costs incurred to date, internal estimates and costs from similar operations in the area. Operating cost estimates are summarized in the following table.

Fire Creek Operating Costs
Category $/dry ton $/oz
Mining Cost $ 169.74 $ 266.57
Surface Transportation $ 36.75 $ 57.72
Processing $ 40.00 $ 62.82
Site Administration and Overhead $ 13.67 $ 21.47
Refining and Sales $ 3.18 $ 5.00
Royalties Payable $ 8.84 $ 13.89
Nevada Net Proceeds $ 25.46 $ 40.03
Silver By-product Sales Credit $ (5.68) $ (8.93)
Total Cash Cost $ 291.96 $ 458.57
Capital $ 113.01 $ 177.48
Total Cost $ 404.97 $ 636.05

Project Sensitivities

The project shows resilience to variances in gold price from $750/oz Au up to $1750/oz Au.

After-tax NPV @ 5% Discount ($ mm's)
Gold Price $750 $1,000 $1,250 $1,500 $1,750
NPV $32 $92 $141 $200 $256

Environmental

Klondex conducts mineral exploration activities in compliance with all applicable local, state and federal environmental protection legislation. Klondex is unaware of any existing environmental issues or compliance problems which have the potential to impact proposed production at Fire Creek. Klondex is working closely with all regulators to ensure that the permitting and compliance strategies are acceptable and minimize delays in production or mine development. At this time, there are no community or social impact matters associated with work being completed at Fire Creek.

Future Permitting

Klondex is currently waiting for approval to an amendment to the Plan of Operations and Reclamation permits (NVN-07976 and reclamation permit 0028); this amendment will allow Klondex to construct and operate two Rapid Infiltration Basins (RIBs) at Fire Creek. Klondex received approval for the Water Pollution Permit for construction and operations of the RIBs (WPCP2013102) in February 2014. Also, Klondex does not anticipate any delays or permitting issues associated with acquiring the required permits for Fire Creek full production. Klondex has initiated a baseline data collection program to as part of anticipated future permitting necessities.

Qualified Person

The technical information contained in this press release has been reviewed and approved by Mark Odell (Nevada PE 13708 and SME 2402150) and Karl Swanson (SME 443076 and AusIMM 304871), who are considered independent Qualified Persons as defined by Canadian National Instrument 43-101.

About Klondex Mines Ltd. ( www.klondexmines.com )

Klondex Mines is focused on becoming a leading integrated gold producer. It is focused on the production, development and exploration of its high quality gold and silver projects, including its central 1200 tpd mill in North Central Nevada. The company is operating an ongoing bulk sampling program at Fire Creek, and is producing gold and silver on an ongoing basis from the Midas Project, located ~100 miles north of Fire Creek.

Cautionary Note Regarding Technical Information and Forward-looking Information

A production decision at the Midas mine was made by prior owners of the mine, prior to the completion of the acquisition of the Midas mine by Klondex. To the knowledge of Klondex, this production decision was not based on a feasibility study of mineral reserves demonstrating economic and technical viability prepared in accordance with National Instrument 43-101 but was based on internal studies conducted by the prior owner of the mine. Klondex has no reason to believe that the data on which such studies were based or that the results of such studies are unreliable. However, readers are cautioned that there is increased uncertainty and higher risk of economic and technical failure associated with such production decisions.

This news release contains certain information that may constitute forward-looking information under applicable Canadian securities legislation, including but not limited to information about current expectations on the timing and success of exploration, development and metallurgical sampling activities, the timing, extent and success of mining operations, the Company's intention and ability to monetize mineralized material, the successful execution of the bulk sampling program at the Fire Creek Project, project development and related permitting, the results of economic analyses in respect of the Fire Creek Project (including those contained in the PEA), the extension of the proposed mine plan beyond the existing development platform at the Fire Creek Project, the ability to expand mineral resources beyond the current mineral resource estimate at the Fire Creek Project, estimates of gold and silver prices, estimates of costs, and estimates of mine development and construction. This forward-looking information entails various risks and uncertainties that are based on current expectations and actual results may differ materially from those contained in such information. These uncertainties and risks include, but are not limited to, the strength of the global economy; the price of gold and silver; operational, funding and liquidity risks; the degree to which mineral resource estimates are reflective of actual mineral resources; the degree to which factors which would make a mineral deposit commercially viable are present; the risks and hazards associated with underground operations; and the ability of Klondex to fund its substantial capital requirements and operations. Risks and uncertainties about the Company's business are more fully discussed in the Company's disclosure materials filed with the securities regulatory authorities in Canada and available at www.sedar.com . Readers are urged to read these materials. Klondex assumes no obligation to update any forward-looking information or to update the reasons why actual results could differ from such information unless required by law.

Klondex Mines Ltd.
Paul Huet
President & CEO
775-284-5757
investors@klondexmines.com
Klondex Mines Ltd.
Alison Tullis
Manager, Investor Relations
647-233-4348
atullis@klondexmines.com

Scroll down for more posts ▼

Top 10 Most Recent News Articles

Happiest Minds Extends Absa Banking Platform Reach

Updated Category News Views 34

Mauritius just handed Happiest Minds a useful, if modest, banking-tech scorecard. On November 19, 2026, the company said its cloud-native Arttha platform had been deployed to support selected capabilities within Spark by Absa, a digital banking and lifestyle app from Absa Bank (Mauritius). This is not the sort of announcement that lets anybody pencil in a giant revenue...

Continue Reading
California Budget Warning Puts Reserves Back in Focus

Updated Category News Views 118

California’s rainy-day umbrella is getting another hard look, and it should. State Controller Malia M. Cohen is pointing to the Legislative Analyst’s Office fiscal outlook as a reminder that budget discipline and stronger reserves are not ornamental good-government phrases. They are the difference between absorbing a revenue wobble and reaching for ugly fixes after...

Continue Reading
MSD's AI Drug Bet Has Promise, but Plenty to Prove

Updated Category News Views 0

A promising molecule remains a very expensive guess until biology agrees. That is the sober lens for MSD's newly announced research collaboration with Isomorphic Labs: potentially meaningful science, certainly interesting strategic positioning, and absolutely no reason yet to start penciling in product sales. One Oncology Target, Not a Finished Drug On November 19, 2026,...

Continue Reading
FAMID's Six-Month IVDR Win Opens Europe's Market Door

Updated Category News Views 34

A six-month regulatory sprint is the sort of result that makes a crowded diagnostics field pause and squint. DNV has issued an IVDR certificate to FAMID Biomedical Technology for its E7 Oncoprotein Rapid Test Kit, a Class C in vitro diagnostic intended to aid diagnosis of cervical epithelial cell lesions through detection of HPV E7 oncoprotein in cervical cell samples....

Continue Reading
Youdao Sets December AGM With No Vote on the Table

Updated Category News Views 74

A shareholder meeting without a vote is more temperature check than showdown, and that is exactly what Youdao has scheduled for December 17, 2026. The company will gather shareholders from 3:00 p.m. to 5:00 p.m. Beijing time at its Beijing office, but it has made one point painfully clear: no proposal will be submitted for shareholder approval. For holders of NYSE: DAO,...

Continue Reading
JOYY Q3 Growth Shows More Than Livestreaming Muscle

Updated Category News Views 39

Revenue finally has more than one pair of legs at JOYY, and that matters a whole lot more than a flashy quarterly headline. The company reported third-quarter 2026 revenue of US$624.6 million, up 15.6% from a year earlier and 5.7% from the prior quarter. Those are not microscopic moves, and the composition is the part that deserves the hard stare. JOYY is still rooted in...

Continue Reading
A Hybrid Book Bets on Muscles, Myth, and Machines

Updated Category News Views 66

Few publishing pitches ask readers to carry a barbell into Tartarus, but A R Quigley is plainly not chasing the middle of the bookstore. Doctrina Machina Learning Machine, released by Palmetto Publishing in November 2026, welds together a strength-training guide and an underground military science-fiction war story. That is an odd little contraption, no use pretending...

Continue Reading
Innoviz's 1-for-20 Split Is a Listing Lifeline Test

Updated Category News Views 93

A twenty-share pile of INVZ is about to become one share, and nobody should confuse that paperwork with a turnaround. Innoviz plans to enact a 1-for-20 reverse split at 11:59 p.m. Eastern on Friday, December 4, with split-adjusted trading expected when Nasdaq opens on December 7. This is a blunt instrument aimed at one immediate problem: getting the quoted share price...

Continue Reading
SAGA's Radar Assays Tighten the Trapper North Case

Updated Category News Views 188

Rock that keeps showing up where the model says it should is the sort of boring news a junior miner desperately needs. SAGA Metals has put out fresh assay results from Radar’s Trapper North area, and the useful part is not merely a loud grade in one hole. It is the apparent persistence of thick titanium-vanadium-iron oxide mineralization across tighter-spaced drilling....

Continue Reading
Scenthound’s Franchise Award Spotlights a Real Test

Updated Category News Views 169

A clean dog may not sound like a growth story, yet Scenthound has turned that neglected chore into a surprisingly serious franchise proposition. The company has won the International Franchise Association’s Emerging Franchisor Award after building its dog-hygiene concept from a 2015 founding into a network with more than 180 open locations. That is a respectable piece...

Continue Reading

Top 5 Most Recently Viewed Articles

Melissa Tapanes Llahues Takes Charge as BASF President

Updated Category News Views 200

Melissa Tapanes Llahues Installed as President of BASF Bercow Radell Fernandez Larkin & Tapanes Partner continues her leadership across the development sectors Melissa Tapanes Llahues, an esteemed land use attorney and civic leader, has been officially installed as President of the Builders Association of South Florida (BASF), a key player in the region's development...

Continue Reading
Petco's Q2 2025 Results: A Look at Performance and Projections

Updated Category News Views 217

Petco's Q2 2025 Financial Results Overview Petco Health and Wellness Company, Inc. (NASDAQ: WOOF) has revealed its financial performance for the second quarter of 2025, showcasing various achievement metrics and prospects for the remainder of the fiscal year. With a commitment to ongoing improvement, Petco has raised its earnings outlook and emphasized a strong economic...

Continue Reading
Empowering Women in STEM: A Transformative Networking Opportunity

Updated Category News Views 309

Empowering Women in STEM: A Transformative Networking Opportunity On November 12, a groundbreaking event titled "Connecting Our Talents; Women in STEM" will take place, bringing together female STEM students from various educational institutions. This event aims to highlight emerging talents and connect them with industry professionals, creating an invaluable network for...

Continue Reading
Analyzing Market Sentiment for Simpson Manufacturing Co Inc.

Updated Category News Views 260

Understanding Market Sentiment for Simpson Manufacturing Co Inc Simpson Manufacturing Co Inc's (NYSE: SSD) short interest has experienced a notable increase, with reports indicating a surge of 6.31% since the latest update. Currently, approximately 1.10 million shares have been sold short, which accounts for about 3.37% of the total shares available for trading. This...

Continue Reading
Growth of Hemp-Based Foods Market: Insights and Trends

Updated Category News Views 104

The Hemp-Based Foods Market: A Growing Trend The hemp-based foods market is experiencing remarkable growth, with projections indicating it will hit $10.6 billion by 2033. This marks a significant increase from $5.4 billion in 2023, boasting a compound annual growth rate (CAGR) of 7.2%. This upward trend shows a clear shift in consumer preferences toward plant-based diets,...

Continue Reading