K-ro17, that is total nonsense. The poster on the other board is a basher. The building we are going to use is Building 1 which has solar panels on the roof as well as electricity from an outside source.
Building 2 isn't yet completed but looks like it will be very soon probably within the next two weeks. It too will have electricity.
SIO
(0)
(0)
Creative Edge Nutrition Inc. (FITX) Stock Research Links