Mag Silver Corp. (MAG.TO) 7.33 $MAG.TO
MAG Silver Reports 2013 Annual Results
Marketwire - Tue Apr 01, 7:24AM CDT
MAG Silver Corp. (TSX: MAG)(NYSE MKT: MVG)(NYSE Amex: MVG) ("MAG" or the "Company"

announces the Company's audited consolidated financial results for the year ended December 31, 2013. For complete details of the annual financial statements and related Management's Discussion and Analysis, please see the Company's filings on SEDAR (www.sedar.com) or on EDGAR (www.sec.gov). All amounts herein are reported in United States dollars unless otherwise specified.
MAG Silver Reports High-Grade Silver-Copper-Zinc Intercepts and Mobilizes Second Drill Rig at Canasil's Salamandra project in Durango State, Mexico
Marketwire - Mon Mar 17, 12:42PM CDT
Canasil Resources Inc. (TSX VENTURE: CLZ)(FRANKFURT: 3CC) ("Canasil" or the Company) announces that MAG Silver Corp. (TSX: MAG)(NYSE MKT: MVG) ("MAG"

has released assay results from MAG's five hole, 3,500 metre Phase 1 drill program on Canasil's Salamandra Silver-Copper-Zinc-Lead Project in Durango State, Mexico. Drilling began in November, 2013 and in February, 2014, an additional 500 metres of drilling was added; this release covers the entire 3,500 metre initial program.
MAG Silver Reports High-Grade Silver-Copper-Zinc Intercepts From the Salamandra Property, Durango, Mexico
Marketwire - Mon Mar 17, 8:05AM CDT
MAG Silver Corp. (TSX: MAG)(NYSE MKT: MVG) ("MAG" or the "Company"

is pleased to announce assay results from its five hole, 3,500 metre Phase 1 drill program on the Salamandra Property in Durango, Mexico optioned from Canasil Resources Inc. ("Canasil"

. Drilling began in November, 2013 and in February, 2014 an additional 500 metres of drilling was added; this release covers the entire 3,500 metre initial program.
MAG Silver Reports Juanicipio Project Obtains Explosives Permit
Marketwire - Wed Mar 12, 8:04AM CDT
MAG Silver Corp. (TSX: MAG)(NYSE MKT: MVG) ("MAG" or the "Company"

announces that the contractor hired by Fresnillo plc to construct the ramp decline on behalf of the Minera Juanicipio S.A. de C.V. Joint Venture, has received its full explosives permit from the Mexican Ministry of Defense. Development of the Juanicipio ramp decline is now being advanced with conventional drill and blast cycles as well as with the continuous miner.
MAG Silver Completes and Extends 3,000 Metre Drill Program at Canasil's Salamandra Project in Durango State, Mexico
Marketwire - Tue Feb 18, 8:26AM CST
Canasil Resources Inc. (TSX VENTURE: CLZ)(FRANKFURT: 3CC) ("Canasil" or the Company) announces that MAG Silver Corp. (TSX: MAG)(NYSE MKT: MVG) ("MAG"

has provided an update on MAG's exploration program at Canasil's Salamandra silver-copper-zinc-lead project in Durango State, Mexico. MAG confirms completion of the required first year 3,000 metre diamond drill program and minimum CAD$ 1,000,000 exploration expenditures, and plans to extend the program by at least an additional 500 metres, under an option agreement for MAG to earn up to a 70% interest in the Salamandra project. Assays are pending for the completed drill holes. MAG further noted that detailed geologic mapping and sampling and systematic review of Canasil's geophysical surveys and drilling results have generated twenty drill targets around the outcropping intrusive complex and surrounding alluvial and volcanic cover at Salamandra.
MAG Silver Development & Exploration Update
Marketwire - Mon Feb 17, 8:01AM CST
MAG Silver Corp. (TSX: MAG)(NYSE MKT: MVG) ("MAG" or the "Company"

is pleased to provide an update on its exploration and development projects in Mexico. At December 31, 2013, the Company had cash of US$25 million, which is sufficient to maintain all of its properties and currently planned programs through 2014 and into 2015.
MAG Silver Mobilizes Drill and Starts 3,000 Meter Drill Program At Canasil's Salamandra Silver-Copper-Lead-Zinc Project in Durango, Mexico
Marketwire - Wed Dec 11, 6:07PM CST
Canasil Resources Inc. (TSX VENTURE: CLZ)(FRANKFURT: 3CC) ("Canasil"

announces that MAG Silver Corp. (TSX: MAG)(NYSE MKT: MVG) ("MAG"

has started the Phase 1 drill program at Canasil's Salamandra silver-copper-lead-zinc project in Durango State, Mexico. The planned program includes a minimum of 3,000 meters of diamond drilling as part of the CAD$ 1,000,000 first year exploration expenditures required by May 2014 under an option agreement for MAG to earn up to a 70% interest in the Salamandra project.
MAG Silver Reports Third Quarter Financial Results
Marketwire - Thu Nov 14, 3:44PM CST
MAG Silver Corp. (TSX: MAG)(NYSE MKT: MVG) ("MAG" or the "Company"

announces the Company's unaudited financial results for the three and nine months ended September 30, 2013. For complete details of the third quarter unaudited Condensed Interim Consolidated Financial Statements and related Management's Discussion and Analysis, please see the Company's filings on SEDAR (www.sedar.com) or on EDGAR (www.sec.gov). All amounts herein are reported in United States dollars unless otherwise specified.
MAG Silver Proposes 3,000 Meter Drill Program at Canasil's Salamandra Project in Durango State, Mexico
Marketwire - Thu Nov 07, 1:29PM CST
Canasil Resources Inc. (Canasil) (TSX VENTURE: CLZ)(FRANKFURT: 3CC) ("Canasil" or the "Company"

announces that MAG Silver Corp. (MAG) (TSX: MAG)(NYSE MKT: MVG) has defined drill targets and proposed an initial 3,000 meter diamond drill program at Canasil's Salamandra silver-copper-zinc-lead project in Durango State, Mexico. The required drill permits are in hand and the drill program is planned to start after preparation of drill access roads and drill pads, within the next three to four weeks. MAG and Canasil entered into a binding Letter Agreement on May 27, 2013, providing for MAG to earn up to a 70% interest in the Salamandra project.
MAG Silver Announces Start of Juanicipio Underground Development
Marketwire - Mon Oct 28, 8:03AM CDT
MAG Silver Corp. (TSX: MAG)(NYSE MKT: MVG) ("MAG" or the "Company"

announces that its joint venture partner and project operator, Fresnillo plc ("Fresnillo"

, has commenced underground development at the Juanicipio project located in the Fresnillo District, Zacatecas State, Mexico. Portal area preparation is in the final stages of completion and a continuous miner is planned to start excavating the uppermost part of the access ramp (see photo, visit following link:
http://file.marketwire.com/release/development_photo.jpg). The initiation of underground work follows a year of engineering, hydrological and environmental studies in support of required permits, all of which are now in hand. The underground work is being carried out under a previously approved initial development budget that includes the commencement of the first 2,500 metres of ramp advancement. The Juanicipio Project is held in Minera Juanicipio S.A. de C.V. ("Minera Juanicipio"

, a Mexican joint venture company owned 44% by MAG and 56% by Fresnillo.
PI Financial Corp Initiates Coverage for MAG Silver Corp. (TSX:MAG) (NYSE MKT:MVG) with Buy Recommendation - Video Research Alert Posted on InvestmentPitch.com
Thomson Reuters ONE - Mon Sep 16, 4:45PM CDT
Vancouver, British Columbia, September 16, 2013 - PI Financial Corp. has initiated coverage on MAG Silver Corp. (TSX:MAG) (NYSE MKT:MVG). Analyst Philip Ker gives the company a buy recommendation, with a speculative risk rating, and a12-month target of $9.00, a premium of 15% to the $7.80 price the day the report was issued.