Imperial Metals Corp (III.TO) 14.62 $III.TO
Eastfield Resources Announces Results from Indata Gold-Copper Property, BC
ACCESSWIRE - Wed Apr 16, 1:05PM CDT
Vancouver, BC / ACCESSWIRE / April 16, 2014 / Eastfield Resources Ltd. ("Eastfield"

(TSX-V: ETF) would like to announce that in September and October of 2013, exploration continued at the Indata property. Indata, encompassing 3,169 hectares, is located approximately 130 kilometres northwest of Fort St. James in central British Columbia. The property is road accessible and fully permitted. It is owned 91.1% by Eastfield Resources Ltd. and 8.9% by Imperial Metals Corporation (TSX: III).
Imperial Reports Operations Resume at Huckleberry Mine
Marketwire - Fri Apr 11, 3:38PM CDT
Imperial Metals Corporation (TSX: III) reports mill operations at Huckleberry mine resumed on April 5. The Huckleberry mill is currently achieving budgeted throughput levels of 700 to 800 tonnes per hour.
Imperial Reports 2013 Financial Results
Marketwire - Mon Mar 31, 3:55PM CDT
Imperial Metals Corporation (the "Company"

(TSX: III) reports financial results for its fiscal year ended December 31, 2013(1). Net income for the year ended December 31, 2013 was $41.0 million ($0.55 per share) compared to net income of $32.6 million ($0.44 per share) in 2012. In addition to variances in revenues and income from mine operations, variations in net income period over period are predominately attributable to movements in foreign exchange and realized and unrealized gains and losses on derivative instruments and taxes.
Imperial Reports Temporary Suspension of Huckleberry Mine Operations
Marketwire - Wed Mar 05, 1:01PM CST
Imperial Metals Corporation (the "Company"

(TSX: III) reports that on February 26, 2014, Huckleberry Mines Ltd. became aware of a physical failure at its SAG mill. After investigation it was discovered that there was a broken tooth in the bull gear. Huckleberry is currently reviewing all options in order to determine the method in which to safely and efficiently repair the damage. Until that time, milling at Huckleberry mine will be suspended. Based on currently available information, it is expected that the SAG mill may not be operational for as much as four months, depending on the availability of the necessary replacement parts to repair the bull gear. Huckleberry expects it will be able to bring forward a number of maintenance activities during the shutdown, including an upgrade to the mill flotation cells.
Imperial Reports Increase in Line of Credit Facility
Marketwire - Fri Feb 21, 7:31AM CST
Imperial Metals Corporation (TSX: III) reports the unsecured line of credit facility ("LOC"

with Edco Capital Corporation, a company controlled by Mr. Edwards, a significant shareholder of the Company, has been increased from a maximum of $225 million to $250 million.
Purepoint Announces Commencement of Drilling at Red Willow Option
Marketwire Canada - Wed Feb 05, 7:00AM CST
Purepoint Uranium Group Inc. (TSX VENTURE

TU) is pleased to report the commencement of the winter drill program at its Red Willow Project in the eastern side of Saskatchewan's Athabasca Basin. The project is managed and operated by Rio Tinto Exploration Canada Inc. ("Rio Tinto"

under the terms of an option agreement allowing them to earn a controlling interest in the Red Willow Project by spending up to $22.5 million in exploration and development expenses.
Graphite One Appoints Robert Cross to Its Advisory Board
Marketwire Canada - Wed Feb 05, 7:00AM CST
Graphite One Resources Inc. (TSX VENTURE:GPH)(OTCQX:GPHOF) ("Graphite One" or the "Company"

is pleased to announce the appointment of Robert Cross to the Company's advisory board. Robert brings with him a wealth of experience in executive leadership in the mining and oil and gas sectors as well as significant capital markets experience.
Imperial Reports on 2013 Production, 2014 Forecast and Credit Facility Increase
Marketwire - Fri Jan 24, 4:32PM CST
Imperial Metals Corporation (TSX: III) reports its annual base and precious metals production(1) from Mount Polley, Huckleberry and Sterling mines was 59.1 million pounds copper, 54,456 ounces gold and 243,013 ounces silver. Copper and gold production were within 1% of planned, and silver production was 24% above the forecast.
Qualitia Celebrates End of Second Year With Increases in Customer Base and Revenue
Marketwire - Wed Jan 22, 5:01AM CST
Qualitia, the market leader for scriptless Selenium test automation software, today announced a 50 percent growth in its client base and a 75 percent growth in revenue in 2013.
TaylorMade SLDR Makes Driver History in 2014 Golf Digest Hotlist Issue
Marketwire - Wed Jan 22, 5:01AM CST
TaylorMade Golf Company, renowned for innovations in performance-enhancing golf equipment, today announced it was the recipient of nine gold medals in the 2014 Golf Digest "Hotlist" equipment issue.
Imperial Amends Credit Facility Terms
Marketwire - Fri Dec 27, 6:20PM CST
Imperial Metals Corporation (TSX: III) reports that it has amended certain terms of the Company's credit facilities to provide additional time for arranging the senior financing for the Red Chris project.
Argentex Announces Drill Results from Its Pinguino Silver-Gold Project Including 4 Metres Averaging 132.9 g/t Ag and 2.53 g/t Au
Marketwire - Thu Nov 28, 8:15AM CST
Argentex Mining Corporation ("Argentex" or the "Company"

(TSX VENTURE: ATX)(OTCQB: AGXMF) is pleased to announce the first drilling results from its 58-hole, 3,003-metre 2013 Phase IX resource development drill program at its 100%-owned Pinguino silver and gold project, located in Santa Cruz Province, Argentina. To date, the Company has received results from 8 reverse circulation ("RC"

holes, while 50 RC holes remain to be processed in the lab.