Was that a "yes or a no" LOL. hey man that plan can be thrown in the garbage. Bill had the interior plan completely re-engineered to accommodate HC's request to speed up the build. The vault will now be on the ground floor.
(0)
(0)
Creative Edge Nutrition Inc. (FITX) Stock Research Links