Okay, here's a "bash" and I'll take my lumps, but
Post# of 56323
After going over the pictures of the existing building looking for evidence as to how far along we are in construction I don't see any evidence of three things I would think are must haves for this operation. 1. a backup generator for power outages, 2. a step down transformer, and 3. any evidence of HVAC/fresh air intake.
The generator and transformer can be set in one morning, but how/where is the air intakes and HVAC units?
Is it possible to have all this within the building?