Edit from previous...having bug issues with this site.....so from that:
From last 10-q
The concept of the DGU is to take waste materials of up to 10 tons per day and use the material as fuel in a small gasifier to provide up to 1.0 MW of electricity and thermal heat. The DGU, as planned is small in size, taking up the space of approximately 2-3 standard 20’ shipping containers. Power generation is accomplished by gasifying the waste (garbage) to generate a combustible syngas that is co-fired in a standard diesel or natural gas internal combustion engine. The engine runs constantly on the syngas, but the primary fuel can be utilized when no waste fuels are available.
The image below is the fats ox....as mentioned it was too bulky..the difference between cirque and this is Cirque intakes 10 tons.this one is 25 tons. Notice the scale via image of individual within drawing..be it the design.