After some thought and looking at the RRC report;
Post# of 39368
After some thought and looking at the RRC report; can someone shed some light on the proposed 300 BOPD being advertised in PR's, by Bull on the Iflub board, etc. Yet the report doesn't add up to a consistent 300 BOPD during the month of August. I know they needed to wait for a gas line approval on MADELEY and then reduced the pressure or shut er down to go lateral, etc. Does anyone have some DD on what is currently being pumped on a daily basis? Keep in mind someone posted Mike said Belize might be completed by last Friday, 9/21. I posted a list of reasons why it wouldn't be. Let's see how long it really takes from that date.