Investors Hangout Stock Message Boards Logo
  • Mailbox
  • Favorites
  • Boards
    • The Hangout
    • NASDAQ
    • NYSE
    • OTC Markets
    • All Boards
  • Whats Hot!
    • Recent Activity
    • Most Viewed Boards
    • Most Viewed Posts
    • Most Posted
    • Most Followed
    • Top Boards
    • Newest Boards
    • Newest Members
  • Blog
    • Recent Blog Posts
    • Recently Updated
    • News
    • Stocks
    • Crypto
    • Investing
    • Business
    • Markets
    • Economy
    • Real Estate
    • Personal Finance
  • Market Movers
  • Interactive Charts
  • Login - Join Now FREE!
  1. Home ›
  2. Stock Message Boards ›
  3. Stock Boards ›
  4. Sierra Resource Group Inc (SIRG) Message Board

CDM Smith seems to have taken over some of these f

Message Board Public Reply | Private Reply | Keep | Replies (0)                   Post New Msg
Edit Msg () | Previous | Next


Post# of 4018
Posted On: 02/16/2014 5:54:44 PM
Avatar
Posted By: microcaps
Re: microcaps #3593
CDM Smith seems to have taken over some of these functions if not all -and see may 23? or june 4 pr

Paul C. Rizzo Associates, Inc. (RIZZO) was retained by Sierra Resource Group (SIERRA) to assist in the planning and development of the Chloride Copper Project near Kingman, Arizona. The Project was formerly known as the Emerald Isle Copper Mine that produced copper from underground and open pit operations sporadically from 1915 to 1993. The most recent operation was that of mining copper oxide ore from an open pit and processing the ore through heap leach and solvent extraction-electro winning (SX/EW) technologies. SIERRA retained RIZZO to:
Develop a Project cost estimate and schedule for SIERRA to bring the mine back into operation
Provide necessary permitting support including preparation of a Mine Plan of Operation including Rights-of-Way applications, and Draft Environmental Assessment for acceptance by the U. S. Bureau of Land Management.
Provide 30% design report providing line diagrams and specifications for refurbishing the SX/EW plant
Provide 30% drawings for heap leach pad and associated process and contaminated runoff collection ponds.
Provide 30% drawings for expanding the open pit and reclamation of the pit and other facilities.
Assessment of known resources and a detailed assessment of “readily available ore” for initial mining (next 3 years) while preparing for expansion from 13,600 pounds of copper per day to 18,000 pounds per day.
In addition, RIZZO has provided considerable documentation to support SIERRA in their financing of the Project.

Background
SIERRA, a Nevada Corporation, owns the Emerald Isle Mine (now Chloride Copper Project). It is located within the Wallapai mining district, a 4 miles wide and 11 miles long mining district defined by the known lateral extent of base and precious metal veining. The Wallapai district is located in Mohave Co., Arizona. The mine property consists of 37 unpatented lode claims and 14 mill-site claims. The total area held by SIERRA amounts to approximately 156 acres. SIERRA, as the owner operator, intends to occupy the claims and develop the mine to extract copper (approximately 1,940,000 tons) from a defined readily available ore deposit. SIERRA intends to refurbish the existing SX/EW plant and construct a new heap leach pad to process and recover elemental copper from existing copper oxide ore from previously mined stockpiles and the upper portion of the open pit. Mining of readily available ore will occur with conventional ripping, excavation, and crushing techniques. The mine is planned to operate primarily within the footprint of past mining activities with minimal disturbance or incursions onto undisturbed parts of the site (less than 12 acres).

The Chloride Copper project highlights RIZZO’s experience with the following tasks:
Resource Assessment;
Environmental Permitting;
Civil Engineering including site layout;
Geotechnical Engineering including slope stability analysis;
Hydrology and Aquifer Studies;
Mine Process Engineering; and
Design Drawings and Specifications.    
View Projects
Underground/Tunneling
Open Pits
Chloride Copper Project
Gualcamayo Tunnel System
Minera Escondida
Tailings Dams


(0)
(0)




Sierra Resource Group Inc (SIRG) Stock Research Links


  1.  
  2.  


  3.  
  4.  
  5.  






Investors Hangout

Home

Mailbox

Message Boards

Favorites

Whats Hot

Blog

Settings

Privacy Policy

Terms and Conditions

Disclaimer

Contact Us

Whats Hot

Recent Activity

Most Viewed Boards

Most Viewed Posts

Most Posted Boards

Most Followed

Top Boards

Newest Boards

Newest Members

Investors Hangout Message Boards

Welcome To Investors Hangout

Stock Message Boards

American Stock Exchange (AMEX)

NASDAQ Stock Exchange (NASDAQ)

New York Stock Exchange (NYSE)

Penny Stocks - (OTC)

User Boards

The Hangout

Private

Global Markets

Australian Securities Exchange (ASX)

Euronext Amsterdam (AMS)

Euronext Brussels (BRU)

Euronext Lisbon (LIS)

Euronext Paris (PAR)

Foreign Exchange (FOREX)

Hong Kong Stock Exchange (HKEX)

London Stock Exchange (LSE)

Milan Stock Exchange (MLSE)

New Zealand Exchange (NZX)

Singapore Stock Exchange (SGX)

Toronto Stock Exchange (TSX)

Contact Investors Hangout

Email Us

Follow Investors Hangout

Twitter

YouTube

Facebook

Market Data powered by QuoteMedia. Copyright © 2025. Data delayed 15 minutes unless otherwise indicated (view delay times for all exchanges).
Analyst Ratings & Earnings by Zacks. RT=Real-Time, EOD=End of Day, PD=Previous Day. Terms of Use.

© 2025 Copyright Investors Hangout, LLC All Rights Reserved.

Privacy Policy |Do Not Sell My Information | Terms & Conditions | Disclaimer | Help | Contact Us