They will have to get approval from the GOB to flow all 3 zones at one time. Then there is the pressure issue. If one zone is of higher pressure than the other then the highest pressure zone will feed into the lower pressure zone causing MAJOR problems. If the zones are all about the same pressure then if the GOB gives approval then they can flow all 3 zones at one time. The API gravity will have to be close to the same. I don't know how royalties are paid in Belize, but in the Gulf, they want to know what zone you are producing so the royalties can get paid right. If one zone is a gas cap and the other is a oil rim, they probably won't let them produce them at one time. If this is the case then TECO will produce the lowest zone first. Produce it out and cement, come up hole, pop perfs, and produce the next zone. The same for the last zone. Hope this helps. ROLL TECO ROLL