Investors Hangout Stock Message Boards Logo
  • Mailbox
  • Favorites
  • Boards
    • The Hangout
    • NASDAQ
    • NYSE
    • OTC Markets
    • All Boards
  • Whats Hot!
    • Recent Activity
    • Most Viewed Boards
    • Most Viewed Posts
    • Most Posted
    • Most Followed
    • Top Boards
    • Newest Boards
    • Newest Members
  • Blog
    • Recent Blog Posts
    • Recently Updated
    • News
    • Stocks
    • Crypto
    • Investing
    • Business
    • Markets
    • Economy
    • Real Estate
    • Personal Finance
  • Market Movers
  • Interactive Charts
  • Login - Join Now FREE!
  1. Home ›
  2. Stock Message Boards ›
  3. Stock Boards ›
  4. Alternative Fuel Technologies Inc (AFTC) Message Board

More on the SBIR Contract Development of the Bosc

Message Board Public Reply | Private Reply | Keep | Replies (0)                   Post New Msg
Edit Msg () | Previous | Next


Post# of 183
Posted On: 01/06/2014 10:20:42 AM
Avatar
Posted By: Luna Tic

More on the SBIR Contract


Development of the Bosch CP-3 Common Rail Pump for JP-8 Fuel


Period of Performance: 04/25/2010 - 04/25/2012


Share Shared

#select2-drop ul { display: none; }


$716K


Phase 2 SBIR



Recipient Firm


Alternative Fuel Technology, LLC
1237 Woodbine
Redford, MI 48239

Principal Investigator
James McCandless




Research Topics



  • Common Rail Pump

  • Wear Reduction

  • JP-8 Fuel






Abstract


Development of the Bosch CP-3 Common Rail Pump for JP-8 Fuel. In Phase 1, tests showed that the CP-3 pump had high wear after only 500 hrs. of testing using JP-8 fuel. This wear is caused by the very low viscosity of the fuel, and the lack of effective anti-wear additives in the fuel. The primary problems identified are: (1) tappet wear, (2) plunger wear (contact button), (3) bearing cavitation, (4) Oldham drive wear, (5) fuel seal and shaft wear and (6) inlet valve and seat wear. The solution to these problems will include changes in basic design geometry, materials and heat treatment. Although our proposal will describe detailed design proposals, the final solutions will stem from engineering analysis. The project is divided into three separate phases: (1) Design, analysis and manufacture of a prototype and a 500 hr accelerated proof test. (2) Deficiencies will be corrected and a 2nd. prototype will be built and tested (500 hrs). (3) Any remaining problems will be corrected and a 3rd prototype will be built. This final prototype will be tested for 1000 hrs(with a 500 hr inspection)under accelerated test conditions. The pump will be inspected and a final report will be written





(0)
(0)




Alternative Fuel Technologies Inc (AFTC) Stock Research Links


  1.  
  2.  


  3.  
  4.  
  5.  






Investors Hangout

Home

Mailbox

Message Boards

Favorites

Whats Hot

Blog

Settings

Privacy Policy

Terms and Conditions

Disclaimer

Contact Us

Whats Hot

Recent Activity

Most Viewed Boards

Most Viewed Posts

Most Posted Boards

Most Followed

Top Boards

Newest Boards

Newest Members

Investors Hangout Message Boards

Welcome To Investors Hangout

Stock Message Boards

American Stock Exchange (AMEX)

NASDAQ Stock Exchange (NASDAQ)

New York Stock Exchange (NYSE)

Penny Stocks - (OTC)

User Boards

The Hangout

Private

Global Markets

Australian Securities Exchange (ASX)

Euronext Amsterdam (AMS)

Euronext Brussels (BRU)

Euronext Lisbon (LIS)

Euronext Paris (PAR)

Foreign Exchange (FOREX)

Hong Kong Stock Exchange (HKEX)

London Stock Exchange (LSE)

Milan Stock Exchange (MLSE)

New Zealand Exchange (NZX)

Singapore Stock Exchange (SGX)

Toronto Stock Exchange (TSX)

Contact Investors Hangout

Email Us

Follow Investors Hangout

Twitter

YouTube

Facebook

Market Data powered by QuoteMedia. Copyright © 2025. Data delayed 15 minutes unless otherwise indicated (view delay times for all exchanges).
Analyst Ratings & Earnings by Zacks. RT=Real-Time, EOD=End of Day, PD=Previous Day. Terms of Use.

© 2025 Copyright Investors Hangout, LLC All Rights Reserved.

Privacy Policy |Do Not Sell My Information | Terms & Conditions | Disclaimer | Help | Contact Us