Doubleview Capital Corp. ( DBV.V .045 ) has compl
Post# of 579
Doubleview Capital Corp. ( DBV.V .045 ) has completed the phase 2 program of geophysical surveys and diamond drilling at its Hat copper-gold porphyry property located in the Sheslay district of northwestern British Columbia. Work commenced late September 2013 and continued until December 2, 2013 when crews and mechanical equipment were removed from the property.
The Sheslay District that extends over 15 km has attracted mineral explorers for more than fifty years. The Hat property had not been drilled prior to Doubleview's recent work.Phase 1 diamond drilling in May and June of this year comprised six drill holes with total length 1304.7 metres. Drill hole H-6, situated at the west edge of "Anomaly B", as previously reported, intersected 110.1 metres with 0.21% copper and 0.015 grams per tonne gold. Immediately prior to commencement of Phase 2 diamond drilling, a 15 line-kilometre induced polarization geophysical survey was undertaken in order to verify and expand the Hat property technical database, parts of which were compiled more than 40 years ago. The complete geophysical, geochemical and geological database then was reviewed by Doubleview's management and consultants who identified or confirmed numerous areas that have characteristics associated with copper-gold porphyry-type mineral deposits and all of which are considered worthy of further work, including drilling.
Speculatively, the various geophysical anomalies may be the near surface expressions of a single large deep-rooted porphyry system with associated copper-gold mineralization and Doubleview, as funds are available, intends to continue investigating that exploration model. Phase 2 program comprised five drill holes with total length 1276.6 metres (5455 feet) all of which were directed to parts of "Anomaly B", a strong chargeability and magnetic anomaly with approximate dimensions 1390 metres by 520 metres. 386 core samples were submitted to an independent accredited laboratory for analysis. QA/QC protocols were observed and results will be reported when received and compiled by Doubleview.
"Anomaly C", with approximate dimensions 1700 metres by 920 metres, and "Anomaly E", with dimensions 1000 metres by 620 metres, were not drill tested in the Phase 2 program but have high priority to be drilled as soon as funding is available. Anomaly C has the strongest chargeability (IP) readings recorded on the property and Anomaly E, which lies immediately north of the recently drill-tested area, has geophysical and geochemical characteristics similar to those of Anomaly B and Anomaly C.