Just a thought though on drilling 3 Kubaceks----I figure the first one drilled will also take their time wirelining and getting the potential strata of oil correct for the perfing etc .. Wouldn't you think they would make sure they do it right, or does it come with the TEXAS drilling personnel quickly and they just zone in on it?? P S…I know they have wirelined both Stocktons….so they will wireline Kubacek…but study it for how long? And is this the funding that was to be used for those 21 wells awhile back, now being used for these drilling events??--I figure the funding covered shallow wells, but these aren't shallow and quite possibly more expensive.
(0)
(0)
Treaty Energy Corporation (TECO) Stock Research Links